Home Up

 

 

Bukidnon 1st
Bukidnon 2nd
Bukidnon 3rd
Bukidnon 4th
CDO City 1st
CDO City 2nd
Camiguin
Iligan City
Lanao del Norte 1st
Lanao del Norte 2nd
Misamis Occ. 1st
Misamis Occ. 2nd
Misamis Oriental 1st
Misamis Oriental 2nd

CAGAYAN DE ORO CITY 1ST

 

 

Department of Public Works and Highways
LIST OF NATIONAL BRIDGES WITH LENGTH, TYPE AND CONDITION
PER DISTRICT ENGINEERING OFFICE
As of 16 October 2024
             
Table 6
Source: RBIA Generated Report                      Unit of Measure: In Linear Meter 
Bdride No. Bridge ID Bridge Name Bridge Type Overall Condition  Length 
Cagayan de Oro City 1st District Engineering Office
1 B02046MN Sapang Br. Permanent Concrete Good          19.49
2 B01397MN Iponan Br. 2 Permanent Concrete Good          64.90
3 B01398MN Iponan Br. 1 Permanent Concrete Fair          90.50
4 B02284MN Sapang Br. 2 Permanent Concrete Good          16.90
5 B02285MN Iponan Br. 3 Permanent Concrete Good          79.00
6 B01353MN Carmen Steel Br. Permanent Steel Poor        200.00
7 B01354MN Binonoan Br. Permanent Concrete Fair          13.70
8 B01835MN Bulua Br. Permanent Concrete Fair            6.00
9 B01356MN Mangalay Br. 1 Permanent Concrete Fair          44.00
10 B01836MN Mangalay Br. 2 Permanent Concrete Fair          10.10

 

 

Back Home Up Next

Bukidnon 1st / Bukidnon 2nd / Bukidnon 3rd / Bukidnon 4th / CDO City 1st / CDO City 2nd / Camiguin / Iligan City / Lanao del Norte 1st / Lanao del Norte 2nd / Misamis Occ. 1st / Misamis Occ. 2nd / Misamis Oriental 1st / Misamis Oriental 2nd

Notes:
 

1.) Bridge data provided are as of  16 October 2024.

2.) The unit of measure for Bridge Data is linear meters.

3.) Further Assessment refers to Bridges that are either under the circumstances of on-going construction, under major maintenance work or washed-out.

4.) National Bridges are classified into:

        Permanent Bridges - are bridges that are composed of concrete and steel.

        Temporary Bridges - are bridges consisting of timber and bailey.

For questions regarding this Website contact feedback@dpwh.gov.ph

 

Last updated: 03/24/25.

Disclaimer