ESTIMATED COST OF DIFFERENT TYPES OF BRIDGE STRUCTURE PER LINEAR METER (PESOS)
as of October 2020
Table 6
                 
                 
ITEM TYPE OF BRIDGE STRUCTURE BRIDGE SITE CONDITION
DRY OR LOW HIGH OR DEEP DRY OR LOW HIGH OR DEEP DRY OR LOW HIGH OR DEEP
WATER LEVEL WATER LEVEL WATER LEVEL WATER LEVEL WATER LEVEL WATER LEVEL
NCR CAR REGION I
I. NEW CONSTRUCTION            
A. CONCRETE BRIDGE STRUCTURE            
  1.) PSC GIRDER BRIDGE WITH BORED PILE FOUNDATION       521,236.81       890,768.85       534,149.37       971,871.16       543,601.54       999,388.35
  2.) PSC GIRDER BRIDGE WITH R. C. PILE FOUNDATION       467,790.59       837,322.63       473,232.21       910,954.00       483,864.02       939,650.83
  3.) RCDG BRIDGE WITH R. C. PILE FOUNDATION       432,886.50       831,846.04       445,556.45       918,177.53       412,324.28       903,656.45
  4.) SINGLE SPAN RCDG BRIDGE WITH R. C. PILE FOUNDATION       464,424.49       700,611.35       470,511.46       754,477.66       436,016.44       735,473.99
B. STEEL BRIDGE STRUCTURE            
  1.) STEEL TRUSS WITH BORED PILE FOUNDATION       803,341.69     1,132,240.91       856,777.72     1,244,592.92       852,069.36     1,256,912.36
  2.) STEEL TRUSS WITH R. C. PILE FOUNDATION       771,273.96     1,100,173.18       820,227.42     1,208,042.62       816,226.85     1,221,069.85
  3.) STEEL GIRDER WITH BORED PILE FOUNDATION       720,567.27     1,093,683.30       762,948.30     1,203,965.79       742,660.19     1,201,740.77
  4.) STEEL GIRDER WITH R. C. PILE FOUNDATION       667,119.30     1,039,980.60       702,029.39     1,142,792.15       682,920.93     1,141,746.77
C. CONCRETE FLYOVER              
  1.) CONCRETE FLYOVER, PSCG TYPE IV, L =30M/35M PER SPAN 476,021.98 494,003.44 513,323.08
 
II. REPLACEMENT/RECONSTRUCTION      
  1.) RCD GIRDER BRIDGE add 15% to the New Construction of Bridge
2.) STEEL BRIDGE add 15% to the New Construction of Bridge
III. BRIDGE REPAIR      
  1.) BRIDGE RETROFITTING      
  a. Retrofitting of Superstucture 438,654.25 428,812.69 424,235.83
    b. Retrofitting of Substructure and Superstucture 604,295.53 599,037.44 587,926.54
  2.) REPLACEMENT OF SUPERSTRUCTURE 407,518.49 409,283.17 446,505.36
  3.) REDECKING 223,366.31 225,338.29 219,629.71
ITEM TYPE OF BRIDGE STRUCTURE BRIDGE SITE CONDITION
DRY OR LOW HIGH OR DEEP DRY OR LOW HIGH OR DEEP DRY OR LOW HIGH OR DEEP
WATER LEVEL WATER LEVEL WATER LEVEL WATER LEVEL WATER LEVEL WATER LEVEL
REGION II REGION III REGION IV-A
I. NEW CONSTRUCTION            
A. CONCRETE BRIDGE STRUCTURE            
  1.) PSC GIRDER BRIDGE WITH BORED PILE FOUNDATION       573,288.52     1,154,563.80       553,772.94     1,036,345.63       507,807.04       983,993.07
  2.) PSC GIRDER BRIDGE WITH R. C. PILE FOUNDATION       512,770.68     1,094,045.97       493,004.41       975,577.11       453,557.44       929,743.48
  3.) RCDG BRIDGE WITH R. C. PILE FOUNDATION       444,235.10     1,066,796.54       437,588.99       956,730.15       414,824.92       927,454.63
  4.) SINGLE SPAN RCDG BRIDGE WITH R. C. PILE FOUNDATION       471,549.38       873,307.56       463,712.68       785,288.15       435,584.79       751,773.72
B. STEEL BRIDGE STRUCTURE            
  1.) STEEL TRUSS WITH BORED PILE FOUNDATION       980,788.54     1,502,012.50       893,499.70     1,323,693.79       864,540.60     1,288,371.21
  2.) STEEL TRUSS WITH R. C. PILE FOUNDATION       944,477.83     1,465,701.80       857,038.59     1,287,232.67       831,990.84     1,255,821.45
  3.) STEEL GIRDER WITH BORED PILE FOUNDATION       833,219.85     1,417,832.09       780,039.67     1,266,018.44       748,083.03     1,227,577.10
  4.) STEEL GIRDER WITH R. C. PILE FOUNDATION       772,700.26     1,357,057.77       719,269.41     1,204,993.44       693,831.69     1,173,071.02
C. CONCRETE FLYOVER                
  1.) CONCRETE FLYOVER, PSCG TYPE IV, L =30M/35M PER SPAN 535,251.25 515,471.63 478,802.64
 
II. REPLACEMENT/RECONSTRUCTION      
  1.) RCD GIRDER BRIDGE add 15% to the New Construction of Bridge
2.) STEEL BRIDGE add 15% to the New Construction of Bridge
III. BRIDGE REPAIR      
  1.) BRIDGE RETROFITTING      
  a. Retrofitting of Superstucture 430,457.02 431,789.95 425,685.48
    b. Retrofitting of Substructure and Superstucture 602,669.80 601,382.80 588,357.39
  2.) REPLACEMENT OF SUPERSTRUCTURE 458,487.80 438,545.15 407,001.67
  3.) REDECKING 226,007.97 224,574.76 219,694.95
ITEM TYPE OF BRIDGE STRUCTURE BRIDGE SITE CONDITION
DRY OR LOW HIGH OR DEEP DRY OR LOW HIGH OR DEEP DRY OR LOW HIGH OR DEEP
WATER LEVEL WATER LEVEL WATER LEVEL WATER LEVEL WATER LEVEL WATER LEVEL
REGION IV-B REGION V REGION VI
I. NEW CONSTRUCTION            
A. CONCRETE BRIDGE STRUCTURE            
  1.) PSC GIRDER BRIDGE WITH BORED PILE FOUNDATION       563,333.54     1,012,089.52       554,502.83     1,037,253.56       552,713.37     1,003,424.44
  2.) PSC GIRDER BRIDGE WITH R. C. PILE FOUNDATION       499,439.15       948,195.13       504,060.06       986,810.78       494,964.28       945,675.35
  3.) RCDG BRIDGE WITH R. C. PILE FOUNDATION       462,076.16       945,747.79       433,571.12       953,091.10       455,140.40       941,481.28
  4.) SINGLE SPAN RCDG BRIDGE WITH R. C. PILE FOUNDATION       502,466.92       797,562.63       461,198.31       782,953.34       494,708.82       788,334.98
B. STEEL BRIDGE STRUCTURE      
  1.) STEEL TRUSS WITH BORED PILE FOUNDATION       893,600.46     1,292,367.07       884,882.42     1,314,649.88       882,063.62     1,281,842.35
  2.) STEEL TRUSS WITH R. C. PILE FOUNDATION       855,263.83     1,254,030.43       854,616.75     1,284,384.21       847,414.16     1,247,192.89
  3.) STEEL GIRDER WITH BORED PILE FOUNDATION       792,963.07     1,244,983.31       766,185.07     1,252,184.43       780,176.51     1,234,262.78
  4.) STEEL GIRDER WITH R. C. PILE FOUNDATION       729,066.93     1,180,832.44       715,740.55     1,201,485.17       722,425.67     1,176,257.21
C. CONCRETE FLYOVER                
  1.) CONCRETE FLYOVER, PSCG TYPE IV, L =30M/35M PER SPAN 506,779.41 513,639.22 499,547.35
 
II. REPLACEMENT/RECONSTRUCTION      
  1.) RCD GIRDER BRIDGE add 15% to the New Construction of Bridge
2.) STEEL BRIDGE add 15% to the New Construction of Bridge
III. BRIDGE REPAIR  
  1.) BRIDGE RETROFITTING  
  a. Retrofitting of Superstucture 428,478.70 426,121.84 430,160.25
    b. Retrofitting of Substructure and Superstucture 600,433.50 586,573.37 599,328.30
  2.) REPLACEMENT OF SUPERSTRUCTURE 422,837.82 453,083.89 421,618.63
  3.) REDECKING 225,655.88 222,149.80 223,678.27
ITEM TYPE OF BRIDGE STRUCTURE BRIDGE SITE CONDITION
DRY OR LOW HIGH OR DEEP DRY OR LOW HIGH OR DEEP DRY OR LOW HIGH OR DEEP
WATER LEVEL WATER LEVEL WATER LEVEL WATER LEVEL WATER LEVEL WATER LEVEL
REGION VII REGION VIII REGION IX
I. NEW CONSTRUCTION            
A. CONCRETE BRIDGE STRUCTURE            
  1.) PSC GIRDER BRIDGE WITH BORED PILE FOUNDATION       566,396.71     1,034,333.98       564,621.57     1,036,398.87       556,427.95       989,647.09
  2.) PSC GIRDER BRIDGE WITH R. C. PILE FOUNDATION       504,436.63       972,373.89       507,134.50       978,911.80       494,379.75       927,598.89
  3.) RCDG BRIDGE WITH R. C. PILE FOUNDATION       482,506.03       986,900.27       484,303.81       992,628.10       467,570.72       934,751.38
  4.) SINGLE SPAN RCDG BRIDGE WITH R. C. PILE FOUNDATION       511,990.67       819,761.21       518,727.57       830,283.66       505,865.61       789,277.02
B. STEEL BRIDGE STRUCTURE            
  1.) STEEL TRUSS WITH BORED PILE FOUNDATION       903,807.49     1,319,409.64       914,067.32     1,333,257.52       880,357.28     1,265,100.36
  2.) STEEL TRUSS WITH R. C. PILE FOUNDATION       866,631.44     1,282,233.59       879,575.08     1,298,765.28       843,128.37     1,227,871.44
  3.) STEEL GIRDER WITH BORED PILE FOUNDATION       809,665.44     1,280,933.84       811,996.89     1,287,045.35       787,868.21     1,224,344.22
  4.) STEEL GIRDER WITH R. C. PILE FOUNDATION       747,703.61     1,218,717.28       754,508.07     1,229,301.79       725,818.27     1,162,039.55
C. CONCRETE FLYOVER            
  1.) CONCRETE FLYOVER, PSCG TYPE IV, L =30M/35M PER SPAN 519,520.21 514,348.94 500,177.57
 
II. REPLACEMENT/RECONSTRUCTION            
  1.) RCD GIRDER BRIDGE add 15% to the New Construction of Bridge
2.) STEEL BRIDGE add 15% to the New Construction of Bridge
III. BRIDGE REPAIR  
  1.) BRIDGE RETROFITTING  
  a. Retrofitting of Superstucture 436,890.24 432,841.93 430,976.61
    b. Retrofitting of Substructure and Superstucture 616,427.78 611,754.13 602,196.86
  2.) REPLACEMENT OF SUPERSTRUCTURE 422,665.35 418,443.28 414,644.62
  3.) REDECKING 233,412.57 232,567.36 226,995.25
ITEM TYPE OF BRIDGE STRUCTURE BRIDGE SITE CONDITION
DRY OR LOW HIGH OR DEEP DRY OR LOW HIGH OR DEEP DRY OR LOW HIGH OR DEEP
WATER LEVEL WATER LEVEL WATER LEVEL WATER LEVEL WATER LEVEL WATER LEVEL
REGION X REGION XI REGION XII
I. NEW CONSTRUCTION            
A. CONCRETE BRIDGE STRUCTURE            
  1.) PSC GIRDER BRIDGE WITH BORED PILE FOUNDATION       577,853.56     1,152,872.01       605,828.30     1,081,778.69       669,955.79     1,206,173.00
  2.) PSC GIRDER BRIDGE WITH R. C. PILE FOUNDATION       517,953.15     1,092,971.60       518,410.82       994,361.21       607,367.95     1,143,585.17
  3.) RCDG BRIDGE WITH R. C. PILE FOUNDATION       496,999.39     1,114,457.02       444,913.81       959,066.25       481,998.89     1,060,204.36
  4.) SINGLE SPAN RCDG BRIDGE WITH R. C. PILE FOUNDATION       537,375.04       928,433.11       464,633.38       773,202.75       514,460.39       868,605.13
B. STEEL BRIDGE STRUCTURE            
  1.) STEEL TRUSS WITH BORED PILE FOUNDATION     1,010,253.33     1,523,317.27       892,206.46     1,313,111.36       952,970.92     1,427,925.74
  2.) STEEL TRUSS WITH R. C. PILE FOUNDATION       974,313.09     1,487,377.02       839,755.98     1,260,660.87       915,418.22     1,390,373.04
  3.) STEEL GIRDER WITH BORED PILE FOUNDATION       876,852.51     1,455,175.50       802,670.62     1,281,997.56       838,420.61     1,377,926.06
  4.) STEEL GIRDER WITH R. C. PILE FOUNDATION       816,950.35     1,395,018.61       715,251.39     1,194,323.60       775,831.03     1,315,081.74
C. CONCRETE FLYOVER          
  1.) CONCRETE FLYOVER, PSCG TYPE IV, L =30M/35M PER SPAN 519,351.76 578,488.59 621,168.94
 
II. REPLACEMENT/RECONSTRUCTION      
  1.) RCD GIRDER BRIDGE add 15% to the New Construction of Bridge
2.) STEEL BRIDGE add 15% to the New Construction of Bridge
III. BRIDGE REPAIR      
  1.) BRIDGE RETROFITTING      
  a. Retrofitting of Superstucture 434,481.65 430,968.66 433,826.75
    b. Retrofitting of Substructure and Superstucture 611,043.70 619,061.65 613,738.01
  2.) REPLACEMENT OF SUPERSTRUCTURE 421,474.91 475,128.86 543,562.09
  3.) REDECKING 231,706.78 231,018.99 230,812.09
ITEM TYPE OF BRIDGE STRUCTURE BRIDGE SITE CONDITION        
DRY OR LOW HIGH OR DEEP        
WATER LEVEL WATER LEVEL        
REGION XIII        
I. NEW CONSTRUCTION            
A. CONCRETE BRIDGE STRUCTURE            
  1.) PSC GIRDER BRIDGE WITH BORED PILE FOUNDATION       615,149.47     1,192,206.54        
  2.) PSC GIRDER BRIDGE WITH R. C. PILE FOUNDATION       549,602.01     1,126,659.09        
  3.) RCDG BRIDGE WITH R. C. PILE FOUNDATION       487,522.98     1,106,986.82        
  4.) SINGLE SPAN RCDG BRIDGE WITH R. C. PILE FOUNDATION       524,815.90       918,248.24        
B. STEEL BRIDGE STRUCTURE          
  1.) STEEL TRUSS WITH BORED PILE FOUNDATION     1,007,646.11     1,522,728.02        
  2.) STEEL TRUSS WITH R. C. PILE FOUNDATION       968,317.64     1,483,399.54        
  3.) STEEL GIRDER WITH BORED PILE FOUNDATION       873,942.52     1,454,263.85        
  4.) STEEL GIRDER WITH R. C. PILE FOUNDATION       808,393.31     1,388,459.91        
C. CONCRETE FLYOVER              
  1.) CONCRETE FLYOVER, PSCG TYPE IV, L =30M/35M PER SPAN 559,403.05        
         
II. REPLACEMENT/RECONSTRUCTION          
  1.) RCD GIRDER BRIDGE add 15% to the New Construction of Bridge        
2.) STEEL BRIDGE add 15% to the New Construction of Bridge        
III. BRIDGE REPAIR            
  1.) BRIDGE RETROFITTING            
  a. Retrofitting of Superstucture 435,216.82      
    b. Retrofitting of Substructure and Superstucture 615,567.07      
  2.) REPLACEMENT OF SUPERSTRUCTURE 468,076.43      
  3.) REDECKING 231,096.19      
                   
Note:                  
  1.) The cost estimate for dry/low water level condition includes Embankment Craneway and Embankment T-Platform, while the cost estimate for high/deep water level condition includes Structural Steel Craneway, Structural Steel T-Platform and Cofferdamming of the footing foundation.
  2.) Cost of Replacement/Reconstruction work may be increased by 15% of the new construction cost due to removal of existing bridge structure and provision of detour and traffic management.
  3.) The price of construction materials are based on the regional average prices plus 15% mark-up for the hauling cost (2nd Quarter of CY 2020), equipment rates are based from the latest ACEL Rates (25th Edition) and labor rates are based on the approved labor rates (June 2020).
  4.) The estimated unit cost was derived from the assumed typical design of Bridge Structure and may vary depending on the actual design. 
  5.) The retrofitting works is assumed to be designed using glass fiber reinforcement on girders.


Notes:
 

1.) Bridge data provided are as of  15 October 2020.

2.) The unit of measure for Bridge Data is linear meters.

3.) Further Assessment refers to Bridges that are either under the circumstances of on-going construction, under major maintenance work or washed-out.

4.) National Bridges are classified into:

        Permanent Bridges - are bridges that are composed of concrete and steel.

        Temporary Bridges - are bridges consisting of timber and bailey.

For questions regarding this website contact feedback@dpwh.gov.ph

 

Last updated: 03/04/21.

Disclaimer