Home Up

 

 

Abra
Apayao 1st
Apayao 2nd
Baguio City
Benguet 1st
Benguet 2nd
Ifugao 1st
Ifugao 2nd
Lower Kalinga
Mt. Province
Mt. Province 2nd
Upper Kalinga

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

BENGUET 1ST

 

Road Name / Section ID Route Numbering Start KM End KM
Asin(Km 8)-Nangalisan-Sn Pascual,Tuba,Be      
S00384LZ   K0258 + (-352) K0275 + 7178
Baguio-Bauang Rd      
S00397LZ 54 K0281 + (-138) K0298 + 069
Baguio-Bontoc Rd      
S00367LZ 204 K0253 + (-586) K0262 + 000
Baguio-Itogon Rd      
S00390LZ   K0254 + (-651) K0268 + 055
Benguet Provl Natl Rd      
S00410LZ      
Benguet-Nueva Vizcaya Rd      
S00382LZ 110 K0254 + (-372) K0319 + 726
City Limit-Sto Tomas Rd      
S00404LZ   K0255 + 000 K0264 + 163
Gurel-Bokod-Kabayan-Buguias-Abatan Rd      
S00379LZ 207 K0318 + (-466) K0342 + 222
S00386LZ 207 K0301 + (-905) K0317 + 533
Itogon-Dalupirip-Sn Manuel Bdry Rd      
S00392LZ   K0265 + (-098) K0278 + 662
Kennon Rd      
S00393LZ 54 K0216 + (-845) K0239 + 593
Kennon-Agat Rd      
S00403LZ   K0217 + (-352) K0217 + 723
Marcos Hi-way      
S00395LZ 208 K0260 + (-686) K0279 + 149
PA Cadre Rd      
S00402LZ      
S00405LZ      
Pico-Lamtang Rd      
S00401LZ   K0255 + (-555) K0261 + 1965
Shilan-Beckel Rd      
S00385LZ   K0261 + (-404) K0263 + 3358
Tawang-Ambiong Rd      
S00387LZ   K0260 + (-609) K0264 + 866

 

Functional Classification / Road Name / Road number / Surface Type Condition Rating
Good Fair Poor Bad No Assessment Total
  Primary Roads         27.74           9.10         1.18         1.56            2.29         41.86
1-1 Baguio-Bauang Rd         11.98           4.37         0.65         0.15            0.06         17.20
  Concrete               -                 -               -            0.05             0.02            0.07
  Asphalt          11.98            4.37          0.65          0.10             0.03          17.13
2-2 Kennon Rd         15.76           4.73         0.53         1.41            2.23         24.66
  Concrete          11.25            2.03             -            0.05             0.15          13.49
  Asphalt            4.50            2.70          0.53          1.36             2.08          11.17
  Secondary Roads         91.96         35.51         6.20         1.16            1.49      136.33
3-3 Baguio-Bontoc Rd           5.98           3.59             -               -              0.05           9.62
  Concrete            4.64            0.74             -               -               0.05            5.42
  Asphalt            1.34            2.85             -               -                  -              4.20
4-4 Benguet-Nueva Vizcaya Rd         59.41           4.56         1.01         0.15            0.34         65.47
  Concrete          59.41            4.56          1.01          0.15             0.34          65.47
5-5 Gurel-Bokod-Kabayan-Buguias-Abatan Rd         23.11         13.93         2.85         1.01            0.60         41.50
  Concrete          23.11          13.93          2.82          1.01             0.41          41.28
  Gravel               -                 -            0.03             -               0.19            0.22
6-6 Marcos Hi-way           3.46         13.43         2.34             -              0.51         19.75
  Concrete            2.75          12.97          2.12             -                  -            17.85
  Asphalt            0.71            0.46          0.22             -               0.51            1.90
  Tertiary Roads         51.10         23.90         4.71         2.13            0.68         82.51
A Asin (Km 8)-Nangalisan-Sn Pascual, Tuba, Benguet-La Union Bdry Rd         21.44           2.16             -               -              0.26         23.85
  Concrete          21.44            2.16             -               -               0.23          23.82
  Gravel               -                 -               -               -               0.03            0.03
B Baguio-Itogon Rd           4.26           6.74         2.00         1.15            0.05         14.21
  Concrete            4.26            6.74          2.00          1.15             0.05          14.21
C Benguet Provl Natl Rd           0.21               -           0.08         0.08                -             0.37
  Concrete            0.21               -            0.08          0.08                -              0.37
D City Limit-Sto Tomas Rd           6.91           1.79             -           0.57                -             9.27
  Concrete            6.91            1.79             -               -                  -              8.70
  Gravel               -                 -               -            0.57                -              0.57
E Itogon-Dalupirip-Sn Manuel Bdry Rd         11.27           1.96             -               -              0.09         13.33
  Concrete          11.27            1.96             -               -               0.09          13.33
F Kennon-Agat Rd           0.95           0.08             -               -              0.04           1.08
  Concrete            0.95            0.08             -               -               0.04            1.08
G PA Cadre Rd               -                 -           0.49         0.21                -             0.70
  Asphalt               -                 -            0.49          0.21                -              0.70
H Pico-Lamtang Rd           2.97           5.07         0.38             -              0.06           8.49
  Concrete            2.97            5.07          0.38             -               0.04            8.46
  Asphalt               -                 -               -               -               0.02            0.02
I Shilan-Beckel Rd           0.48           3.46         1.69             -              0.13           5.76
  Concrete            0.48            3.46          1.69             -               0.13            5.76
J Tawang-Ambiong Rd           2.61           2.63         0.07         0.12            0.05           5.48
  Concrete            2.61            2.63          0.07          0.12             0.05            5.48
TOTAL      170.80         68.51       12.08         4.85            4.46      260.70
 


 

Back Home Up Next

Abra / Apayao 1st / Apayao 2nd / Baguio City / Benguet 1st / Benguet 2nd / Ifugao 1st / Ifugao 2nd / Lower Kalinga / Mt. Province / Mt. Province 2nd / Upper Kalinga

 

Notes:
 

1.) Road data provided are as of  09 November 2017.

2.) The unit of measure for Road Data is kilometers.

3.) No Assessment refers to Road Sections that are either under construction and/or segments with length below the 50-meter gauging length.

4.) National Roads are classified into:

        Primary Roads - roads that connect cities of > 100,000 population.   

        Secondary Roads - other roads which complement with the national arterial roads to provide access to main population and production centers of the country.  

        Tertiary Roads - other existing roads under DPWH which perform a local function. (In the map, these roads are represented only by letters.)

 

For questions regarding this Website contact dpwh_feedback@yahoo.com or the DPWH CFMC .

 

Last updated: 10/24/08.

Disclaimer