Modification and Realignment



Date Posted GAA Year Reference No SARO Number SARO Date Region Implementing Office Description
July 6, 2017 FY 2017 WIN7E01782 UACS No. 292003020401725 January 1, 2017 National Capital Region Metro Manila 1st District Engineering Office
As per GAA
MFO 2 – Flood Management Services – Construction/ Maintenance of Flood Mitigation Structure and Drainage Systems – Construction of Floodgate at Gen. Bautista Outfall , Brgy. Kabayanan, San Juan City [Construction of Flood Mitigation Structure]
UACS No. 292003020401725
Physical Target/ Cost (‘000)
Original: 1 Floodgate
Unit Cost: (‘000): P15,000.0/floodgate
Allocation (‘000): P15,000.0
WIN7E01782

As Modified
MFO 2 – Flood Management Services – Construction/ Maintenance of Flood Mitigation Structure and Drainage Systems – Rehabilitation/Improvement of Drainage System at San Gabriel via San Venancio St., San Jorge and E. Fernandez St., San Juan City [Construction of Flood Mitigation Structure]
UACS No. 292003020401725
Physical Target/ Cost (‘000)
New: 642 lm
Unit Cost: (‘000): P23.364/lm
Estimated Cost (‘000): P15,000.0
WIN7E01782
July 6, 2017 2017 WIN7G01637 FY 2017 (R.A 10924) June 15, 2017 Region IX Zamboanga City District Engineering Office
Construction and Maintenance of Bridges along National Roads - Construction of New Permanent Bridges -
Construction of One Lane Bridge at Both Sides of Existing Togtobo Bridge (B00560MN) along Pagadian City - Zamboanga City Road
Bridge Limits: K1864+206.25 - K1864+244..09, L = 37.84 ln.m.
Area = 37.84 x 9.54 = 360.9936 sq.m.
Allocation:
P 25.00 Million (Total)
P 24.00 Million (Bridge)
P 1.00 Million (ROW Acquisition)
Physical Target:
360.9936 sq.m. (Bridge)
280 sq.m. (ROW Acquisition)
Unit Cost:
P 66,483.17/ sq.m. (Bridge)
P 3,571.43/ sq.m. (ROW Acquisition)
July 6, 2017 FY 2017 WIN7E01774 UACS No. 292003020401781 January 1, 2017 National Capital Region Metro Manila 1st District Engineering Office
As per GAA
MFO 2 – Flood Management Services – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems – Rehabilitation of San Joaquin-Buting Road Drainage Outfall to Pateros River including laterals, Pasig City [Construction of Drainage Structure]
UACS No. 292003020401781
Physical Target/ Cost (‘000)
Original: 820 lm
Unit Cost (‘000): P18.293/lm
Allocation (‘000): P15,000.0
WIN7E01774

As Modified
MFO 2 – Flood Management Services – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems – Rehabilitation of Drainage System along San Joaquin-Buting Road, Pasig City [Construction of Drainage Structure]
UACS No. 292003020401781
Physical Target/ Cost (‘000)
New: 813 lm
Unit Cost (‘000): P18.45/lm
Estimated Cost (‘000): P15,000.0
WIN7E01774
July 6, 2017 CY 2017 UACS: 165003016800025 GAA CY 2017 RA 10924 December 29, 2016 Region IV-B Southern Mindoro Engineering District Office
as MODIFIED:
MF01 - National Road Network Services
- Network Development
- Off-carriageway Improvement including
Drainage
- Secondary Road:
Mindoro Oriental/Occidental East Coastal Road
K0183+000 - K0184+800,
K0196+000 - K0197+000,
K0197+673 - K0198+340,
K0199+583 - K0200+000

CW1 = 18,174.90 sq.m.
Shoulder Paving/Construction

CW2 = 4,536.10 lane km
Construction of Drainage Structure
along Road

Total Php = 76.700 Million
CW1 Php = 40,977.062 Million
CW2 Php = 35,722.938 Million
July 6, 2017 FY 2017 WIN7E01777 UACS No. 103004010309905 January 1, 2017 National Capital Region Metro Manila 1st District Engineering Office
As per GAA
Locally-Funded Projects – VIILP – Buildings and Other Structures – Multipurpose/Facilities – Construction of Multipurpose Building including Site Development, Brgy. Fortune, Marikina City [Construction of Multi-Purpose Building]
UACS No. 103004010309905
Physical Target/ Cost (‘000)
Original: 1 bldg.
Unit Cost (‘000): P17,500.0/bldg.
Allocation (‘000): P17,500.0
WIN7E01777

As Modified
Locally-Funded Projects – VIILP – Buildings and Other Structures – Multipurpose/Facilities – Construction/ Repair/Rehabilitation of Multipurpose Building including Site Developments, Brgy. Fortune, Marikina City [CW1-Construction of Multi-Purpose Building] [CW2-Rehabilitation/ Major Repair of Multi-Purpoose Building]
UACS No. 103004010309905
Physical Target/ Cost (‘000)
New: CW1 - 4 bldg.
CW2 – 2 bldg.
Unit Cost (‘000): CW1 - P3,550.0/bldg.
CW2 – P1,650.0/bldg.
Estimated Cost (‘000): P17,500.0
WIN7E01777
July 6, 2017 CY 2017 UACS: 165003016800003 GAA CY 2017 RA 10924 December 29, 2016 Region IV-B Southern Mindoro Engineering District Office
as MODIFIED:
MF01 - National Road Network Services
- Network Development
- Off-Carriageway Improvement including
Drainage
- Secondary Road :
Bongabong - sagana - Roxas - San Aquilino Rd
K0127+900 - K0 131 +120 RHS/LHS

CW1 = 17,132.63 sq.m.
Shoulder Paving/Construction

CW2 = 4,631.90 lane km
Construction of Drainage along Road

Total Php = 62,114.00 Million
CW1 Php = 30,119.923 million
CW2 Php = 31,994.077 million


July 6, 2017 2017 WIN7G01636 FY 2017 (R.A 10924) June 15, 2017 Region IX Zamboanga City District Engineering Office
Construction of Flood Control/Revetment along San Roque River including Tributaries, Brgy. San Roque (including Right of Way Acquisition), Zamboanga City
Site I (Both Side)
Sta. 0+470 - Sta. 0+790
Site II
Left Side = Sta. 0+450 - Sta. 0+490
Exception = Sta. 0+490 - Sta. 0+538
Left Side = Sta. 0+538 - Sta. 0+886
Site III (Both Side)
Sta. 0+300 - Sta. 0+553.50
Site IV (Both Side)
Sta. 1+201.50 - Sta. 1+256.50
Allocation:
P 35.00 Million (Total)
P 34,562,500 (Construction of Flood Mitigation Structure)
P 437,500.00 (ROW Acquisition)
Physical Target:
1,989 lm. (Construction of Flood Mitigation Structure)
125 sq.m. (ROW Acquisition)
Unit Cost:
P 17,376.82/ lm. (Construction of Flood Mitigation Structure)
P 3,500.00/ sq.m. (ROW Acquisition)
July 6, 2017 FY 2017 WIN7E01779 UACS No. 292003020401724 January 1, 2017 National Capital Region Metro Manila 1st District Engineering Office
As per GAA
MFO 2 – Flood Management Services – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems – Construction of Floodgate at A. Villa Outfall, Brgy. Batis, San Juan City [Construction of Flood Mitigation Structure]
UACS No. 292003020401724
Physical Target/ Cost (‘000)
Original: 1 Floodgate
Unit Cost (‘000): P30,000.0/floodgate
Allocation (‘000): P30,000.00
WIN7E01779

As Modified
MFO 2 – Flood Management Services – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems – Construction of Slope Protection/Parapet Wall Extension, Brgy. Kabayanan, Sn Juan City [Construction of Flood Mitigation Structure]
UACS No. 292003020401724
Physical Target/ Cost (‘000)
New: 212 lm
Unit Cost (‘000): P141.509/lm
Estimated Cost (‘000): P30,000.00
WIN7E01779
July 6, 2017 FY 2017 WIN7E01773 UACS No. 292003020401759 January 1, 2017 National Capital Region Metro Manila 1st District Engineering Office
As per GAA
MFO 2 – Flood Management Services – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems – Improvement of Drainage Laterals along J.B. Vargas Bridge, Brgy. Addition Hills, San Juan City [Construction of Drainage Structure along Road]
UACS No. 292003020401759
Physical Target/ Cost (‘000)
Original: 12 lm
Unit Cost (‘000): P1,666.67/lm
Allocation (‘000): P20,000.0
WIN7E01773

As Modified
MFO 2 – Flood Management Services – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems – Rehabilitationn/Improvement of Drainage System along Veloso, Diwa and Asiñas Sts., Barangay Salapan, San Juan City [Rehabilitation/Major Repair of Drainage Structure along Road]
UACS No. 292003020401759
Physical Target/ Cost (‘000)
New: 12 lm
Unit Cost (‘000): P24.272/lm
Estimated Cost (‘000): P20,000.0
WIN7E01773

July 6, 2017 2017 WIN7G01639 FY 2017 (R.A 10924) June 15, 2017 Region IX Zamboanga City District Engineering Office
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems -
Construction/Extension of Flood Control along San Jose Gusu Creek, Baliwasan - San Jose Gusu Section (including Right of Way Acquisition), Zamboanga City
Site I
Right Side = Sta. 0+000 - Sta. 0+111
Left Side = Sta. 0+050 - Sta. 0+324
Site II
Right Side = Sta. 2+268 - Sta. 2+455.20
Allocation:
P 8.00 Million (Total)
P 7,720,000.00 (Construction of Flood Mitigation Structure)
P 280,000.00 (ROW Acquisition)
Physical Target:
572 lm. (Construction of Flood Mitigation Structure)
80 sq.m. (ROW Acquisition)
Unit Cost:
P 13,496.50/ lm (Construction of Flood Mitigation Structure)
P 3,500.00/ sq.m. (ROW Acquisition)

Pages