Modification and Realignment



Date Posted GAA Year Reference No SARO Number SARO Date Region Implementing Office Description
July 7, 2017 2017 WIN7F04996 RA 10924 January 27, 2017 Region III Pampanga 1st District Engineering Office
Asset Preservation of National Roads
Rehabilitation/Reconstruction /Upgrading of Damaged Paved national Roads including Drainage based on Pavement Management System/Highway Development Management-4 (HDM-4) - Tertiary

Sto. Tomas-Minalin Rd (Minalin-Macabebe Section)
K0064 +(-060) - K0064+043.30, K064+043.30 -K0064+327,
K0064+ 364.80 - K0064+441, K0064 +441 - K0064+684.60

(CW-1: Reconstruction from Concrete to Concrete)
(CW-2: Construction of Drainage Structure along Road)
July 7, 2017 2017 WIN7F04981 RA 10924 January 27, 2017 Region III Pampanga 1st District Engineering Office
Asset Preservation of National Roads
Rehabilitation/Reconstruction/Upgrading of Damaged Paved National Road including drainage based on Pavement Management System/ Highway Development Management-4 (HDM-4) - Primary

Jose Abad Santos Ave (JASA)
K0078+178.30 - K0078+207.30, K0080+074 - K0081+450

(Reconstruction from Asphalt to Concrete including Drainage)
July 7, 2017 2017 WIN7F04970 RA 10924 January 27, 2017 Region III Pampanga 1st District Engineering Office
Asset Preservation of National Roads
Preventive Maintenance based on Pavement Management System / Highway Development Management -4 (HDM-4)
Tertiary

Sn Fernando - Lubao Rd
K0067+246.50 - K0067+846

(Preventive Maintenance of Road: Asphalt Overlay)
July 6, 2017 CY 2017 UACS: 165003016800077 GAA CY 2017 RA 10924 December 29, 2016 Region IV-B Southern Mindoro Engineering District Office
as MODIFIED:
MF01 - National Road Network Services
- Network Development
- Off-Carriageway Improvement including
Drainage
- Secondary Roads :
Calapan South Road
K0124+160 - K0124+960,
K0124+976 - K0126+366.5
CW1 = 13,374.15 sq.m.
Shoulder Paving/Construction

CW2 = 1,907.85 lm
Construction of Drainage Structure
along Road

CW3 = 1,095.20 sq.m.
Construction of Road Slope
Protection Structure

Total Php = 39.912 Million

( Shoulder Paving/Construction/
Construction of Drainage Structure
along Road/
Construction of Road Slope
Protection Structure )
July 6, 2017 CY 2017 UACS: 165003014200252 GAA CY 2017 RA 10924 December 29, 2016 Region IV-B Southern Mindoro Engineering District Office
as MODIFIED:
MF01 - National Road Network Services
- Asset Preservation of National Roads
- Rehabilitation/Reconstruction of
National Roads
Mindoro Oriental/Occidental East Coastal Road
K0194+000 - K0194+989

CW1 = 1.978 lane km
Rehabilitation of Concrete Road

CW2 = 2,643.65 sq.m.
Construction of Road Slope Protection Structure

Total Php = 30.361 Million

( Rehabilitation of Concrete Road/
Construction of Road Slope
Protection Structure )


July 6, 2017 CY 2017 UACS: 165003014600203 GAA CY 2017 RA 10924 December 29, 2016 Region IV-B Southern Mindoro Engineering District Office
as MODIFIED:
MF01 - National Road Network Services
- Asset Preservation of National Roads
- Rehabilitation/Reconstruction of National Roads
with Slips, Slope Collapse, and Landslide
- Tertiary Road:
Calapan South Road
K0192+260 - K0192+300,
K0192+500 - K0192+580,
K0192+700 - K0192+800

CW1 = 1,945.37 sq.m.
Construction of Road Slope
Protection Structure

CW2 = 0.935 lane km
Rehabilitation of Concrete Road

CW3 = 1,870.00 sq.m.
Shoulder Paving/Construction

Total Php = 20.00 Million

( Construction of Road Slope
Protection Structure/Rehabilitation of
Concrete Road/Shoulder Paving/
Construction )

July 6, 2017 CY 2017 UACS: 165003014500131 GAA CY 2017 RA 10924 December 29, 2016 Region IV-B Southern Mindoro Engineering District Office
as MODIFIED :
MF01 - National Road Network Services
- Asset Preservation of National Roads
- Rehabilitation/Reconstruction of National
Roads with Slips, Slope Collapse and
Landslide
- Secondary Roads :
Calapan South Road
K0119+000 - K0119+436,
K0160+580 - K0160+860,
K0161+553.5 - K0161+860

CW1 = 12,098 sq.m.
Construction of Road Slope
Protection Structure

CW2 = 0.8366 lane km
Shoulder Paving/Construction

Total Php = 98.00 Million
CW1 = 87,931.75 Million
CW2 = 10,068.25 Million
July 6, 2017 FY 2017 WIN7E01778 UACS No. 103004010310105 January 1, 2017 National Capital Region Metro Manila 1st District Engineering Office
As per GAA
Locally-Funded Projects – LIP – Buildings and Other Structures – Multipurpose/Facilities – Construction of Multi-level Multi-Purpose Building, Brgy. Katuparan, Taguig City [Construction of Multi-Purpose Building]
UACS No. 103004010310105
Physical Target/ Cost (‘000)
Original: 1 bldg.
Unit Cost (‘000): P2,000.0/bldg.
Allocation (‘000): P2,000.00
WIN7E01778

As Modified
Locally-Funded Projects – LIP – Buildings and Other Structures – Multipurpose/Facilities – Completion of Multi-Purpose Building, Brgy. Upper Bicutan, Taguig City [Construction of Multi-Purpose Building]
UACS No. 103004010310105
Physical Target/ Cost (‘000)
New: 1 bldg.
Unit Cost (‘000): P2,000.0/bldg.
Estimated Cost (‘000): P2,000.00
WIN7E01778
July 6, 2017 2017 WIN7G01638 FY 2017 (R.A 10924) June 15, 2017 Region IX Zamboanga City District Engineering Office
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems -
Construction of Flood Mitigation Structure - Construction of Flood Control at Tumaga River Basin, Tetuan - Tugbungan Section, Zamboanga City,
Sta. 0+000 - Sta. 0+210
Allocation:
P20.00 Million (Total)
P19.00 Million (Flood Control Structure)
P1.00 Million (ROW Acquisition)
Physical Target:
210.00 lm (Flood Control Structure)
238sq.m. (ROW Acquisition)
Unit Cost:
P 90,476.19/ lm. (Flood Control Structure)
P 4,201.68/ sq.m. (ROW Acquisition)
July 6, 2017 FY 2017 WIN7E01781 UACS No. 165004050400613 January 1, 2017 National Capital Region Metro Manila 1st District Engineering Office
As per GAA
Locally-Funded Projects – LIP – Roads and Bridges – Local Bridges – Construction of Footbridge along Buli Creek, Brgy. Sta. Lucia, Pasig City [Construction of Bridge]
UACS No. 165004050400613
Physical Target/ Cost (‘000)
Original: -
Unit Cost (‘000): -
Allocation (‘000): P2,000.0
WIN7E01781

As Modified
Locally-Funded Projects – LIP – Roads and Bridges – Rehabilitation of Javier Bridge along F. Legaspi St., Brgy. Maybunga, Pasig City [Rehabilitation/Major Repair of Bridge]
UACS No. 165004050400613
Physical Target/ Cost (‘000)
New: 1 bridge
Unit Cost (‘000): P2,000.0/bridge
Estimated Cost (‘000): P2,000.0
WIN7E01781

Pages