Modification and Realignment



Date Posted GAA Year Reference No SARO Number SARO Date Region Implementing Office Description
July 10, 2017 FY 2017 WIN7F05016 UACS No. 292003020402000 January 1, 2017 National Capital Region Quezon City 2nd Engineering District Office
As per GAA
MFO 2: Flood Management Services – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems, Improvement/ Rehabilitation of Ermitanio Creek Tributary Quezon City (Construction of Flood Mitigation Structure)
UACS No. 292003020402000
Physical Target/ Cost
Per GAA/ Original: 472 Lm
Unit Cost: P42.373T/Lm
Allocation: Php 20.0M
WIN7F05016

As Modified
MFO 2: Flood Management Services – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems, Improvement/ Rehabilitation of Ermitanio Creek Tributary 7th St., Brgy. Doña Imelda, Quezon City (Construction of Flood Mitigation Structure)
UACS No. 292003020402000
Physical Target/ Cost
As Modified: 672 Lm
Unit Cost: P29.762T/Lm
Estimated Cost: Php 20.0M
WIN7F05016
July 10, 2017 FY 2017 WIN7F05021 UACS No. 165003014900087 January 1, 2017 National Capital Region Quezon City 2nd Engineering District Office
As per GAA
MFO-1 National Road Network Services: Asset Preservation of National Roads – Construction/ Upgrading / Rehabilitation of Drainage along National Roads – Tertiary: Rehabilitation/ Major Repair of Drainage Structure along Road – Kalayaan Ave – K0013+(-863) – K0013+800 (Rehabilitation/ Major Repair of Drainage Structure along Road)
UACS No. 165003014900087
Physical Target/ Cost
Per GAA Original: Physical Target 3.326 lm
Unit Cost: P6.02T/Lm
Allocation: P20M
WIN7F05021

As Modified
MFO-1 National Road Network Services: Asset Preservation of National Roads – Construction/ Upgrading / Rehabilitation of Drainage along National Roads – Tertiary: Kalayaan Ave K0012+(-012) – K0013+588 (Rehabilitation/ Major Repair of Drainage Structure along Road)
UACS No. 165003014900087
Physical Target/ Cost
As Modified: Physical Target 1,600 lm
Unit Cost: P12.500T/Lm
Estimated Cost: P20M
WIN7F05021
July 10, 2017 FY 2017 WIN7F05015 UACS No. 165003013800079 January 1, 2017 National Capital Region Quezon City 2nd Engineering District Office
As Per GAA
MFO-1 National Road Network Services: Asset Preservation of National Roads – Preventive Maintenance based on Pavement Management System/ Highway Development and Management-4 (HDM-4) – Primary: Preventive Maintenance of Road: Concrete Reblocking – E Rodriguez Jr Ave – K0012+-226 – K0014+000 (Preventive Maintenance of Road: Concrete Reblocking)
UACS No. 165003013800079
Physical Target/ Cost
Per GAA/ Original: Physical Target 4.528 lane-km
Unit Cost: P5.521M/lane-km
Allocation: P25M
WIN7F05015

As Modified
As Per GAA
MFO-1 National Road Network Services: Asset Preservation of National Roads – Preventive Maintenance based on Pavement Management System/ Highway Development and Management-4 (HDM-4) – Primary: E Rodriguez Jr Ave. K0012+-406 – K0014+-348 (Preventive Maintenance of Road: Concrete Reblocking)
UACS No. 165003013800079
Physical Target/ Cost
Per GAA/ Original: Physical Target 1.816 lane-km
Unit Cost: P13.766M/lane-km
Estimated Cost: P25M
WIN7F05015
July 10, 2017 FY 2017 WIN7F05020 UACS No. 165003014000149 January 1, 2017 National Capital Region Quezon City 2nd Engineering District Office
MFO-1 National Road Network Services: Asset Preservation of National Roads – Preventive Maintenance based on Pavement Management System/ Highway Development and Management-4 (HDM-4) – Tertiary: Preventive Maintenance of Road: Concrete Reblocking – E Rodriguez Jr Ave – K0012+-621 – K0014+231 (Preventive Maintenance of Road: Concrete Reblocking)
UACS No. 165003014000149
Physical Target/ Cost
Per GAA/ Original: Physical Target 5.7 lane-km
Unit Cost: P7.894M/lane-km
Allocation: P45M
WIN7F05020

As Modified
MFO-1 National Road Network Services: Asset Preservation of National Roads – Preventive Maintenance based on Pavement Management System/ Highway Development and Management-4 (HDM-4) – Tertiary: E. Rodriguez Jr. Ave. – K0012+-621 – K0014+231 (Preventive Maintenance of Road: Asphalt Overlay)
UACS No. 165003014000149
Physical Target/ Cost
Per GAA/ Original: Physical Target 10.242 lane-km
Unit Cost: P4.393M/lane-km
Estimated Cost: P45M
WIN7F05020
July 10, 2017 FY 2017 WIN7F05022 UACS No. 165003014900088 January 1, 2017 National Capital Region Quezon City 2nd Engineering District Office
As per GAA
MFO-1 National Road Network Services: National Road Network Services: Asset Preservation of National Roads – Construction/ Upgrading/ Rehabilitation of Drainage along National Roads – Tertiary: Rehabilitation/ Major Repair of Drainage Structure along Road – Tomas Morato – K0009+140 – K0009+1076 (Rehabilitation/ Major Repair of Drainage Structure along Road)
UACS No. 165003014900088
Physical Target/ Cost
Per GAA/ Original: Physical Target 1872 lm
Unit Cost: P10.68T/lm
Allocation: P20M
WIN7F05022

As Modified
MFO-1 National Road Network Services: National Road Network Services: Asset Preservation of National Roads – Construction/ Upgrading/ Rehabilitation of Drainage along National Roads – Tertiary: Tomas Morato – K0009+1174 – K0009+1594 (Rehabilitation/ Major Repair of Drainage Structure along Road)
UACS No. 165003014900088
Physical Target/ Cost
Per GAA/ Original: Physical Target 1,256 lm
Unit Cost: P15.92T/lm
Estimated Cost: P20M
WIN7F05022
July 10, 2017 FY 2017 WIN7F05011 UACS No. 165003013900132 July 2, 2017 National Capital Region Quezon City 2nd Engineering District Office
As per GAA
MFO-1 National Road Network Services: Asset Preservation of National Roads – Preventive Maintenance based on Pavement Management System/ Highway Development and Management-4 (HDM-4) – Secondary: Preventive Maintenance or Road: Asphalt Overlay – Quezon ave – K0011+-551 – K0006+529 (Preventive Maintenance of Road: Asphalt Overlay)
UACS No. 165003013900132
Physical Target/ Cost
Per GAA/ Original: Physical Target 30.5 lane-km
Unit Cost: P1.451M/lane-km
Allocation: P44.264M
WIN7F05011

As Modified
MFO-1 National Road Network Services: Asset Preservation of National Roads – Preventive Maintenance based on Pavement Management System/ Highway Development and Management-4 (HDM-4) – Secondary: Quezon Ave – K0010+000-K0009+171, K0008+000-K0008+633, K0006+717–K0006+200 (Preventive Maintenance of Road: Asphalt Overlay)
UACS No. 165003013900132
Physical Target/ Cost
As Modified: Physical Target 9.43 lane-km
Unit Cost: P4.693M/lane-km
Estimated Cost: P44.264M
WIN7F05011
July 10, 2017 FY 2017 WIN7F05046 UACS No. 292004020100393 January 1, 2017 National Capital Region Metro Manila 2nd District Engineering Office
As per GAA
Locally Funded Projects, LIP, Flood Control and Drainage – Flood Control Structures/Facilities: Construction of Drainage System of Delarama and Mashville B.F., Brgy. BF, Parañaque City – Construction of Drainage Structure (Construction of Drainage Structure)
UACS No. 292004020100393
Physical Target/ Cost
Original: 500 lineal meters
Unit Cost: P6.00T/lineal meters
Allocation Cost: P3.00M
WIN7F05046

As Modified
Locally Funded Projects, LIP, Flood Control and Drainage – Flood Control Structures/Facilities: Upgrading of Drainage System along Doña Soledad Extension Brgy. Moonwalk, Parañaque City, 2nd LD, Metro Manila (Construction of Drainage Structure)
UACS No. 292004020100393
Physical Target/ Cost
Modified: 100 lineal meters
Unit Cost: P27.27T/lineal meters
Estimated Cost: P3.00M
WIN7F05046
July 10, 2017 FY 2017 WIN7F05036 UACS No. 292003020401840 January 3, 2017 National Capital Region Metro Manila 2nd District Engineering Office
As per GAA
MFO 2 – Flood Management Services – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems: Construction of Drainage Structure – Upgrading of Drainage System along Sanchez St., SAV 1, Parañaque City (Construction of Drainage Structure)
UACS No. 292003020401840
Physical Target/ Cost
Original: 600 lineal meters
Unit Cost: P25.00T/lineal meters
Allocation Cost: P15.00M
WIN7F05036

As Modified
MFO 2 – Flood Management Services – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems: Improvement/ Clearing and Desilting of Sapang Buwaya Tributary (Sanchez Section), Greenheights Village, Brgy. San Isidro, Parañaque City (Rehabilitation/Major Repair of Slope Protection Structure)
UACS No. 292003020401840
Physical Target/ Cost
Original: 360 lineal meters
Unit Cost: P41.67T/lineal meters
Estimated Cost: P15.00M
WIN7F05036
July 10, 2017 FY 2017 WIN7F05042 UACS No. 292003020401531 January 1, 2017 National Capital Region NCR - Regional Office
As per GAA
MFO 2 – Flood Management Services – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems: Construction of Revetment – Construction of Revetment Wall along San Juan River (Construction of Revetment
UACS No. 292003020401531
Physical Target/ Cost
Original: 1,362 lineal meter
Unit Cost: P124.82T/lineal meter
Allocation Cost: P170.0M
WIN7F05042

As Modified
MFO 2 – Flood Management Services – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems: Construction of Pumping Station at Brgy. Batis, San Juan City (Construction of Flood Mitigation Facility)
UACS No. 292003020401531
Physical Target/ Cost
Modified: 1 facility
Unit Cost: P170.00M/facility
Estimated Cost: P170.0M
WIN7F05042
July 10, 2017 FY 2017 WIN7F05001 UACS No. 165003014200187 January 1, 2017 National Capital Region North Manila District Engineering Office
As per GAA
MFO 1 – National Road Network Services – Asset Preservation of National Roads – Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/ Highway Development Management-4 (HDM-4) – Secondary: Reconstruction from Asphalt to Concrete – AH Lacson Ave – K0010+(-321.5) – K0009+500.40, K0009+(-504.70) – K0010+325.20 (Construction from Asphalt to Concrete)
UACS No. 165003014200187
Physical Target/ Cost
Original: 10.056 lane-km
Unit Cost (P’000): P1.621M/ lane-km
Allocation Cost: P16.302M
WIN7F05001

As Modified
MFO 1 – National Road Network Services – Asset Preservation of National Roads – Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/ Highway Development Management-4 (HDM-4) – Secondary: AH Lacson Ave – K0009+-037.20 – K0009+449.60 (Reconstruction with Drainage Improvement)
UACS No. 165003014200187
Physical Target/ Cost
Modified: 1.2372 lane-km
Unit Cost (P’000): P13.177M/ lane-km
Estimated Cost: P16.302M
WIN7F05001