Modification and Realignment



Date Posted GAA Year Reference No SARO Number SARO Date Region Implementing Office Description
August 9, 2017 2017 103004010311211 FY 2017 GAA January 1, 2017 Region III Zambales 1st District Engineering Office
Local Infrastructure Program - Buildings and Other Structures - Multipurpose/Facilities - Construction of Tourism Information Center Building, Pundaquit, San Antonio, Zambales
August 8, 2017 2017 WIN7F05060 FY 2017 GAA January 1, 2017 Region III Bataan 2nd District Engineering Office
Network Development - Improvement/Widening of National Roads - Tertiary - Balanga Poblacion Rd including RROW (S01336LZ) Chainage 0 - Chainage 500
(CW-1 Road Widening)
(ROW Acquisition)
August 2, 2017 2017 WIN7E01616 FY 2017 GAA RA 10924 December 29, 2016 Region V Camarines Norte District Engineering Office
As per GAA:
Locally-Funded Projects: Local Infrastructure Program: Roads and Bridges: Local Roads: Concreting / Construction of Iberica Road in Brgy. Iberica, Labo, Camarines Norte (Construction of Concrete Road)
Physical Target: 0.40 lane.km
Unit Cost: P5.0M/lane-km
Allocation: P2.0M

As MODIFIED:
Locally-Funded Projects: Local Infrastructure Program: Roads and Bridges: Local Roads: Concreting / Construction of Iberica Road in Brgy. Iberica, Labo, Camarines Norte (Construction of Concrete Road)
Physical Target: 0.742 lane.km
Unit Cost: P2,695.42M/lane-km
Estimated Cost: P2.0M

August 2, 2017 2017 WIN7E01576 FY 2017 GAA RA 10924 December 29, 2016 Region V Camarines Norte District Engineering Office
As per GAA:
Locally Funded Projects - Roads and Bridges - Local Roads : Construction of road, Barangay Il, Daet, Camarines Norte
(Construction of Concrete Road)
Physical Target: -
Unit Cost (P'000): -
Allocation Cost (P'000): P2,000

As MODIFIED:
Locally Funded Projects - Roads and Bridges - Local Roads : Construction of road, Barangay Il,
Daet, Camarines Norte
(Construction of Concrete Road)
Physical Target: 0.57
Unit Cost (P'000): P3,509/lane-km
Estimated Cost (P'000): P2,000
July 26, 2017 2017 WIN7E01032 FY 2017 GAA RA 10924 December 29, 2016 Region V Sorsogon District Engineering Office
As per GAA:
MFO 2 - Flood Management Services: Construction/Maintenance of Flood Mitigation Structures and Drainage Systems, Construction of Milagrosa River Control, Sorsogon City, Sorsogon
(Construction of Flood Mitigation Structure)
Physical Target: 780 Lm
Unit Cost: P44.87/Lm
Allocation: PhP35.0M

As MODIFIED:
MFO 2 - Flood Management Services: Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems, Construction of Milagrosa River Control, Castilla, Sorsogon
(Construction of Flood Mitigation Structure)
Physical Target: 780 Lm
Unit Cost: P44.87/Lm
Estimated Cost: PhP35.0M
July 26, 2017 2017 WIN7E01058 FY 2017 GAA RA 10924 December 29, 2016 Region V Sorsogon District Engineering Office
As per GAA:
MFO 1: National Road Network Services - Asset
Preservation of National Roads, Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/Highway Development and Management - 4 (HDM-4) Tertiary, Reconstruction from Concrete to Concrete, Jct Donsol-Banuang Gurang Rd - (S04433LZ)
K0578+800 - K0579+732, K0580+604 - K0580+906, K0583+540 - K0584+423,
K0585+046 - K0585+333 (Rehabilitation of Concrete Road)
Physical Target: 4.6 Lm
Unit Cost: P10,434.78/Lm
Allocation: PhP 48.0M

As MODIFIED:
MFO 1: National Road Network Services - Asset
Preservation of National Roads, Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/Highway Development and Management - 4 (HDM-4) Tertiary, Reconstruction from Concrete to Concrete, Jct Donsol-Banuang Gurang Rd - (S04433LZ) - K0578+800 - K0579+732, K0580+604 - K0580+906, K0583+540 - K0584+832 (Rehabilitation of Concrete Road)
Physical Target: 2,844 Lm
Unit Cost: P16,877.64/Lm
Estimated Cost: PhP 48.0M
July 25, 2017 CY 2017 WIN7F05033 GAA CY 2017 RA 10924 December 29, 2016 Region IV-B Palawan 3rd District Engineering Office
as MODIFIED:
Locally-Funded Projects
- Local Infrastructure Program
- Buildings and Other Structures
- Multipurpose/Facilities:
Construction of Multi-Purpose Building,
Barangay Bancao-Bancao, Puerto Princesa City
1 Bldg.
Php 3.00 Million
July 25, 2017 CY 2017 WIN7F05047 GAA CY 2017 RA 10924 December 29, 2016 Region IV-B Marinduque District Engineering Office
as MODIFIED:
Locally-Funded Projects
- Local Infrastructure Program
- Roads and Bridges :
National Roads:
- Road Opening of the Missing Gaps at
Dr. Damian Reyes Road ( Boac Side )
K0027+645 - K0028+056.5
L = 0.823 lane km
Php = 100.00 Million
( Road Opening )
July 25, 2017 CY 2017 UACS: 165003015700149 GAA CY 2017 RA 10924 December 29, 2016 Region IV-B Palawan 2nd District Engineering Office
as MODIFIED:
MF01 - National Road Network Services
- Road Upgrading ( Unpaved to Paved )
based on Gravel Road Strategies,
Traffic benchmark for Upgrading to
Paved Road Standards (HDM-4 Project Analysis)
- Secondary Road:
Road Upgrading
Gravel to Paved
Aramaywan - Berong - Pto. Princesa Road
L = 4.211 lane km
Php = 100.00 Million
July 25, 2017 2017 WIN7F04906 FY 2017 GAA RA 10924 December 29, 2016 Region V Albay 2nd Engineering Office
As per GAA:
Locally Funded Projects, Local Infrastructure Program - Buildings and Other Structures - School Buildings - Construction of Two Classroom Building, Victory Village Elementary School, Victory Village, Legazpi City, Albay
Physical Target: 2 Classroom
Unit Cost: P1.875M/Classroom
Allocation: PhP 3.750M

As MODIFIED:
Locally Funded Projects, Local Infrastructure Program - Buildings and Other Structures - School Buildings - Construction of Three Classroom Building, Victory Village Elementary School, Victory Village, Legazpi City, Albay
(Construction of Classrooms)
Physical Target: 3 Classroom
Unit Cost: P1.250M/Classroom
Estimated Cost: PhP 3.750M