Modification and Realignment



Date Posted GAA Year Reference No SARO Number SARO Date Region Implementing Office Description
July 20, 2018 FY 2018 WIN8G02514 FY 2018 GAA January 4, 2018 Region III Pampanga 2nd District Engineering Office
Local Roads and Bridges - Local Roads – Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Improvement / Concreting of Sapang Uwak Road leading to Miyamit Falls, Porac Pampanga
July 20, 2018 FY 2018 WIN8G02513 FY 2018 GAA January 4, 2018 Region III Pampanga 2nd District Engineering Office
Local Roads and Bridges - Local Roads – Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Reconstruction (Completion) of Sta. Ursula Bridge, Betis, Guagua, Pampanga
July 17, 2018 FY 2018 WIN8G02339 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Albay 2nd Engineering Office
UACS No.: 300106200017000
Project ID: P00257546LZ
LOCAL PROGRAM – Local - Flood Control and Drainage - Flood Control Structures / Facilities - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Construction of Flood Mitigation along Taysan River, Legazpi City
Physical Target: CW1 – Construction of Flood Mitigation Structure/ 802.00 lm
Unit Cost: CW1 – Php 60.16T/lm.
Estimated Cost: Php 50.0 M
(As Modified)
July 17, 2018 FY 2018 WIN8G02348 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Albay 2nd Engineering Office
UACS No.: 300106200008000
Project ID: P00257537LZ
LOCAL PROGRAM – Flood Control and Drainage - Flood Control Structures/ Facilities - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Construction of Flood Control Structures along Matanag River (Upstream) - Sta. 0+460 - Sta. 0+910 (B/S), Legazpi City
Physical Target: CW1 – Construction of Flood Mitigation Structure/ 900 lm
Unit Cost: CW1 – Php 107.22T/lm.
Estimated Cost: Php 100.0 M
(As Modified)
July 17, 2018 FY 2018 WIN8G02332 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Albay 2nd Engineering Office
UACS No.: 320102100424000
Project ID: P00221296LZ
OO2: Protect Lives and Properties Against Major Floods – Flood Management Program – Construction/Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers – Construction/Improvement of Quirangay River Course (Poblacion Section), Sta. 0+000 - Sta. 0+125.30, Sta. 0+005 - Sta. 0+063, Sta. 0+025 - Sta. 0+125.30, Sta. 0+005 - Sta. 0+063, Albay
Physical Target: CW1 – Construction of Flood Mitigation Structure/ 341.60 lm
Unit Cost: CW1 – Php 71.721T/lm.
Estimated Cost: Php 25.00 M
(As Modified)
July 16, 2018 FY - 2018 WIN8F05662 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Regional Office IV-B
Local Program

Local Roads and Bridges - Local Roads
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects

FROM:
Widening of Puerto Princesa South Road
from two (2) to six (6) lanes including drainage
and other ancillary works,
K0111+300 - K0113+800,
Narra

CW1: 9.812 lane km
Allocation: 150,000,000 Php

TO:
Widening of Puerto Princesa Road
from to (2) to six (6) lanes including drainage
and other ancillary works,
K0110+440 - K0110+740,
K0111+300 - K0111+439,
K0111+455 - K0111+677,
K0111+693 - K0113+714,
K0111+736 - K0113+770,
Narra

CW1: 10.892 lane km
Allocation: 150,000,000 Php
July 16, 2018 FY - 2018 WIN8F05663 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Regional Office IV-B
Local Program

Local roads and Bridges - Local Roads
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects

FROM:
Widening of Puerto Princesa South Road
from two (2) to six (6) lanes including
drainage and other ancillary works,
K0232+100 - K0234+300,
Bataraza

CW1: 9.248 lane km
Allocation: 135,000,000 Php

TO:
Widening of Puerto Princesa South Road
from two (2) to six (6) lanes including
drainage and other ancillary works,
K0232+171 - K0234+460,
Bataraza

CW1: 9.604 lane km
Allocation: 135,000,000 Php
July 16, 2018 FY - 2018 Win8F05654 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Regional Office IV-B
Local program

Local Roads and Bridges - Local Roads
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects

FROM:
Widening of Puerto Princesa Road
from two (2) to six (6) lanes including
drainage and other ancillary works,
K0226+400 - K228+900,

CW1: 9.784 lane km
Allocation: 150,000,000 Php

TO:
Widening of Puerto Princesa South Road
from two (2) to six (6) lanes including
drainage and other ancillary works,
K0226+400 - K0226+5378,
K0226+562 - K0228+954,
Bataraza

CW1: 10.00 lane km
Allocation: 150,000,000 Php

July 16, 2018 FY 2018 WIN8G02338 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Masbate 1st District Engineering Office
UACS No.: 300106200114000
Project ID: P00257615LZ
Local Infrastructure Program – Flood Control and Drainage - Flood control Structures / facilities - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Construction of Seawall along the coast of Barangay Poblacion East to Brgy. Poblacion West, Milagros, Masbate
Physical Target: CW1 – Construction of Flood Mitigation Structure/ 358.75 lm
Unit Cost: CW1 – Php 55.19 T/lm
Estimated Cost: Php 20.0 M
(As Modified)
July 16, 2018 FY 2018 WIN8G02502 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Regional Office V
UACS No.: 300201100014000
Project ID: P00230380LZ
Convergence and Special Support Program –
Construction/Improvement of Access Roads leading to Airports – Jct. DM (Tabon-tabon)-Mariawa-Homapon-Maslog-Lamba-Puro Road leading to Bicol International Airport, Albay
Physical Target: CW1 – Road Widening/ 5.998 lane-km
CW2 - Construction of Drainage Structure along Road/ 4,340 lm.
CW3 - Construction of Road Slope Protection Structure/ 6,687.65 sq.m
Unit Cost: CW1 – Php 16.85 M/lane-km
CW2 – Php 11,042.74/lm.
CW3 – Php 2,248.12/sq.m.
Estimated Cost: Php 170.0 M
(As Modified)

Pages