ESTIMATED COST OF BRIDGE STRUCTURE PER LINEAR METER (PESOS)
as of December 2015
Table 2.3
                 
ITEM TYPE OF BRIDGE STRUCTURE BRIDGE SITE CONDITION
DRY OR LOW HIGH OR DEEP DRY OR LOW HIGH OR DEEP DRY OR LOW HIGH OR DEEP
WATER LEVEL WATER LEVEL WATER LEVEL WATER LEVEL WATER LEVEL WATER LEVEL
NCR CAR REGION I
I. NEW CONSTRUCTION            
A. CONCRETE BRIDGE STRUCTURE            
  1.) PSC GIRDER BRIDGE WITH BORED PILE FOUNDATION                448,844.60             1,120,164.45                461,291.19             1,115,227.19                478,534.49             1,147,722.24
  2.) PSC GIRDER BRIDGE WITH R. C. PILE FOUNDATION                449,131.37             1,124,886.84                440,071.90             1,098,440.08                499,715.82             1,173,235.45
  3.) RCDG BRIDGE WITH R. C. PILE FOUNDATION                315,980.48             1,068,543.83                307,170.89             1,040,960.80                336,041.93             1,083,428.10
  4.) SINGLE SPAN RCDG BRIDGE WITH R. C. PILE FOUNDATION                266,817.86                846,326.57                256,854.28                825,819.36                283,897.01                853,642.81
        without craneway with structural craneway without craneway with structural craneway without craneway with structural craneway
       
B. STEEL BRIDGE STRUCTURE            
  1.) STEEL TRUSS WITH BORED PILE FOUNDATION                588,212.91             1,188,461.74                579,623.19             1,167,125.12                582,067.82             1,179,081.49
  2.) STEEL TRUSS WITH R. C. PILE FOUNDATION                501,351.78             1,114,072.05                488,711.05             1,087,619.62                509,440.42             1,118,096.95
  3.) STEEL GIRDER WITH BORED PILE FOUNDATION                495,422.75             1,172,568.28                506,440.31             1,166,038.35                496,633.20             1,171,429.72
  4.) STEEL GIRDER WITH R. C. PILE FOUNDATION                496,287.25             1,177,159.49                485,844.91             1,149,128.89                518,400.66             1,196,821.98
C. CONCRETE FLYOVER              
  1.) CONCRETE FLYOVER, PSCG TYPE IV, L =30M/35M PER SPAN 455,112.14 459,144.79 489,237.56
 
II. REPLACEMENT/RECONSTRUCTION      
  1.) RCD GIRDER BRIDGE add 15% to the New Construction of Bridge
2.) STEEL BRIDGE add 15% to the New Construction of Bridge
III. BRIDGE REPAIR      
  1.) BRIDGE RETROFITTING      
  a. Retrofitting of Superstucture 436,876.34 421,098.44 421,525.95
    b. Retrofitting of Substructure and Superstucture 594,612.30 579,181.81 578,261.72
  2.) REPLACEMENT OF SUPERSTRUCTURE 382,065.35 379,714.11 416,971.56
  3.) REDECKING 208,227.30 206,832.95 208,412.27
ESTIMATED COST OF BRIDGE STRUCTURE PER LINEAR METER (PESOS)
as of December 2015
Table 2.3
                 
ITEM TYPE OF BRIDGE STRUCTURE BRIDGE SITE CONDITION
DRY OR LOW HIGH OR DEEP DRY OR LOW HIGH OR DEEP DRY OR LOW HIGH OR DEEP
WATER LEVEL WATER LEVEL WATER LEVEL WATER LEVEL WATER LEVEL WATER LEVEL
REGION II REGION III REGION IV-A
I. NEW CONSTRUCTION            
A. CONCRETE BRIDGE STRUCTURE            
  1.) PSC GIRDER BRIDGE WITH BORED PILE FOUNDATION                496,405.13             1,257,807.64                460,983.80             1,156,018.61                462,480.52             1,137,231.19
  2.) PSC GIRDER BRIDGE WITH R. C. PILE FOUNDATION                505,136.59             1,270,954.95                454,017.74             1,153,357.93                497,583.88             1,176,698.36
  3.) RCDG BRIDGE WITH R. C. PILE FOUNDATION                338,127.46             1,184,151.43                301,856.74             1,076,751.06                360,351.06             1,116,933.74
  4.) SINGLE SPAN RCDG BRIDGE WITH R. C. PILE FOUNDATION                288,300.66                927,235.91                256,206.34                846,639.55                296,984.69                886,896.04
        without craneway with structural craneway without craneway with structural craneway without craneway with structural craneway
       
B. STEEL BRIDGE STRUCTURE            
  1.) STEEL TRUSS WITH BORED PILE FOUNDATION                638,003.68             1,317,408.31                589,154.67             1,209,331.12                595,190.99             1,201,158.81
  2.) STEEL TRUSS WITH R. C. PILE FOUNDATION                557,022.36             1,248,079.28                503,017.34             1,135,260.57                529,407.33             1,146,742.52
  3.) STEEL GIRDER WITH BORED PILE FOUNDATION                539,980.93             1,307,032.76                496,264.74             1,196,967.79                513,773.81             1,194,173.83
  4.) STEEL GIRDER WITH R. C. PILE FOUNDATION                549,337.99             1,320,056.30                489,855.14             1,194,183.27                549,450.71             1,233,514.55
C. CONCRETE FLYOVER                
  1.) CONCRETE FLYOVER, PSCG TYPE IV, L =30M/35M PER SPAN 503,835.61 472,284.11 458,539.97
 
II. REPLACEMENT/RECONSTRUCTION      
  1.) RCD GIRDER BRIDGE add 15% to the New Construction of Bridge
2.) STEEL BRIDGE add 15% to the New Construction of Bridge
III. BRIDGE REPAIR      
  1.) BRIDGE RETROFITTING      
  a. Retrofitting of Superstucture 422,372.03 424,414.03 425,383.57
    b. Retrofitting of Substructure and Superstucture 584,884.22 579,451.29 582,410.86
  2.) REPLACEMENT OF SUPERSTRUCTURE 423,137.87 402,008.77 382,808.54
  3.) REDECKING 210,222.50 204,640.04 209,181.74
ESTIMATED COST OF BRIDGE STRUCTURE PER LINEAR METER (PESOS)
as of December 2015
Table 2.3
                   
ITEM TYPE OF BRIDGE STRUCTURE BRIDGE SITE CONDITION
DRY OR LOW HIGH OR DEEP DRY OR LOW HIGH OR DEEP DRY OR LOW HIGH OR DEEP
WATER LEVEL WATER LEVEL WATER LEVEL WATER LEVEL WATER LEVEL WATER LEVEL
REGION IV-B REGION V REGION VI
I. NEW CONSTRUCTION            
A. CONCRETE BRIDGE STRUCTURE            
  1.) PSC GIRDER BRIDGE WITH BORED PILE FOUNDATION                490,388.03             1,156,064.71                495,713.86             1,179,764.51                492,738.99             1,141,392.33
  2.) PSC GIRDER BRIDGE WITH R. C. PILE FOUNDATION                495,291.00             1,165,414.38                524,566.08             1,213,063.51                545,989.27             1,199,111.92
  3.) RCDG BRIDGE WITH R. C. PILE FOUNDATION                348,972.34             1,098,189.70                358,294.20             1,126,272.64                395,115.94             1,127,748.36
  4.) SINGLE SPAN RCDG BRIDGE WITH R. C. PILE FOUNDATION                287,729.42                877,990.18                296,064.05                894,723.36                318,758.37                904,203.97
        without craneway with structural craneway without craneway with structural craneway without craneway with structural craneway
       
B. STEEL BRIDGE STRUCTURE      
  1.) STEEL TRUSS WITH BORED PILE FOUNDATION                616,697.08             1,217,308.55                598,344.61             1,214,510.74                605,098.35             1,192,885.35
  2.) STEEL TRUSS WITH R. C. PILE FOUNDATION                527,122.21             1,138,648.65                534,638.78             1,162,044.24                541,507.22             1,140,003.88
  3.) STEEL GIRDER WITH BORED PILE FOUNDATION                530,050.48             1,201,465.49                522,107.90             1,211,843.69                529,250.00             1,183,625.07
  4.) STEEL GIRDER WITH R. C. PILE FOUNDATION                535,625.44             1,210,685.06                551,612.53             1,245,017.84                583,146.67             1,241,213.66
C. CONCRETE FLYOVER                
  1.) CONCRETE FLYOVER, PSCG TYPE IV, L =30M/35M PER SPAN 480,909.45 489,658.24 478,198.36
 
II. REPLACEMENT/RECONSTRUCTION      
  1.) RCD GIRDER BRIDGE add 15% to the New Construction of Bridge
2.) STEEL BRIDGE add 15% to the New Construction of Bridge
III. BRIDGE REPAIR  
  1.) BRIDGE RETROFITTING  
  a. Retrofitting of Superstucture 426,808.07 424,910.30 426,444.12
    b. Retrofitting of Substructure and Superstucture 589,959.41 580,654.46 588,775.57
  2.) REPLACEMENT OF SUPERSTRUCTURE 397,286.77 420,090.29 396,199.29
  3.) REDECKING 211,140.97 211,704.15 210,715.71
ESTIMATED COST OF BRIDGE STRUCTURE PER LINEAR METER (PESOS)
as of December 2015
Table 2.3
                 
ITEM TYPE OF BRIDGE STRUCTURE BRIDGE SITE CONDITION
DRY OR LOW HIGH OR DEEP DRY OR LOW HIGH OR DEEP DRY OR LOW HIGH OR DEEP
WATER LEVEL WATER LEVEL WATER LEVEL WATER LEVEL WATER LEVEL WATER LEVEL
REGION VII REGION VIII REGION IX
I. NEW CONSTRUCTION            
A. CONCRETE BRIDGE STRUCTURE            
  1.) PSC GIRDER BRIDGE WITH BORED PILE FOUNDATION                479,404.11             1,160,924.65                499,572.76             1,166,619.55                511,361.42             1,155,199.14
  2.) PSC GIRDER BRIDGE WITH R. C. PILE FOUNDATION                464,920.36             1,150,790.03                514,651.12             1,187,666.73                492,643.93             1,140,733.61
  3.) RCDG BRIDGE WITH R. C. PILE FOUNDATION                330,550.87             1,093,970.81                375,287.49             1,128,440.72                352,856.81             1,083,436.38
  4.) SINGLE SPAN RCDG BRIDGE WITH R. C. PILE FOUNDATION                281,516.10                872,686.39                313,727.44                903,363.44                286,316.12                878,752.33
        without craneway with structural craneway without craneway with structural craneway without craneway with structural craneway
       
B. STEEL BRIDGE STRUCTURE            
  1.) STEEL TRUSS WITH BORED PILE FOUNDATION                613,696.30             1,224,451.35                624,911.68             1,227,897.09                618,821.65             1,207,065.77
  2.) STEEL TRUSS WITH R. C. PILE FOUNDATION                518,861.43             1,141,140.79                542,679.88             1,156,500.79                521,417.55             1,119,977.87
  3.) STEEL GIRDER WITH BORED PILE FOUNDATION                529,214.62             1,216,416.27                547,734.66             1,220,449.37                555,401.06             1,204,977.15
  4.) STEEL GIRDER WITH R. C. PILE FOUNDATION                515,317.90             1,206,149.14                563,443.69             1,241,367.17                537,361.44             1,190,378.05
C. CONCRETE FLYOVER                
  1.) CONCRETE FLYOVER, PSCG TYPE IV, L =30M/35M PER SPAN 476,421.55 489,212.52 486,208.65
 
II. REPLACEMENT/RECONSTRUCTION            
  1.) RCD GIRDER BRIDGE add 15% to the New Construction of Bridge
2.) STEEL BRIDGE add 15% to the New Construction of Bridge
III. BRIDGE REPAIR  
  1.) BRIDGE RETROFITTING  
  a. Retrofitting of Superstucture 430,393.42 429,441.17 429,011.28
    b. Retrofitting of Substructure and Superstucture 593,665.80 599,012.22 596,235.68
  2.) REPLACEMENT OF SUPERSTRUCTURE 391,018.52 394,397.04 393,344.78
  3.) REDECKING 213,695.62 218,984.04 215,981.25
ESTIMATED COST OF BRIDGE STRUCTURE PER LINEAR METER (PESOS)
as of December 2015
Table 2.3
                 
ITEM TYPE OF BRIDGE STRUCTURE BRIDGE SITE CONDITION
DRY OR LOW HIGH OR DEEP DRY OR LOW HIGH OR DEEP DRY OR LOW HIGH OR DEEP
WATER LEVEL WATER LEVEL WATER LEVEL WATER LEVEL WATER LEVEL WATER LEVEL
REGION X REGION XI REGION XII
I. NEW CONSTRUCTION            
A. CONCRETE BRIDGE STRUCTURE            
  1.) PSC GIRDER BRIDGE WITH BORED PILE FOUNDATION                511,633.64             1,247,031.21                544,951.66             1,218,485.16                556,032.87             1,268,472.59
  2.) PSC GIRDER BRIDGE WITH R. C. PILE FOUNDATION                514,827.91             1,255,183.38                532,363.10             1,210,828.23                574,366.36             1,291,747.15
  3.) RCDG BRIDGE WITH R. C. PILE FOUNDATION                371,585.20             1,197,159.05                353,810.00             1,109,097.99                387,101.64             1,185,697.26
  4.) SINGLE SPAN RCDG BRIDGE WITH R. C. PILE FOUNDATION                306,117.39                955,591.57                294,777.20                881,579.08                324,491.86                948,234.93
        without craneway with structural craneway without craneway with structural craneway without craneway with structural craneway
       
B. STEEL BRIDGE STRUCTURE            
  1.) STEEL TRUSS WITH BORED PILE FOUNDATION                655,370.19             1,320,523.03                638,947.98             1,243,693.17                662,178.82             1,303,283.72
  2.) STEEL TRUSS WITH R. C. PILE FOUNDATION                572,939.40             1,249,047.18                533,167.55             1,149,099.74                574,101.63             1,226,132.37
  3.) STEEL GIRDER WITH BORED PILE FOUNDATION                578,693.29             1,319,785.28                552,348.48             1,231,598.20                569,315.35             1,287,465.73
  4.) STEEL GIRDER WITH R. C. PILE FOUNDATION                582,501.80             1,327,808.38                540,389.15             1,223,815.99                588,303.25             1,310,606.19
C. CONCRETE FLYOVER          
  1.) CONCRETE FLYOVER, PSCG TYPE IV, L =30M/35M PER SPAN 497,119.91 552,494.80 548,971.16
 
II. REPLACEMENT/RECONSTRUCTION      
  1.) RCD GIRDER BRIDGE add 15% to the New Construction of Bridge
2.) STEEL BRIDGE add 15% to the New Construction of Bridge
III. BRIDGE REPAIR      
  1.) BRIDGE RETROFITTING      
  a. Retrofitting of Superstucture 429,422.76 427,375.69 431,062.07
    b. Retrofitting of Substructure and Superstucture 598,127.27 608,326.09 602,949.15
  2.) REPLACEMENT OF SUPERSTRUCTURE 399,701.02 443,003.82 455,626.37
  3.) REDECKING 218,088.99 217,288.80 219,298.72
ESTIMATED COST OF BRIDGE STRUCTURE PER LINEAR METER (PESOS)
as of December 2015
Table 2.3
                 
ITEM TYPE OF BRIDGE STRUCTURE BRIDGE SITE CONDITION        
DRY OR LOW HIGH OR DEEP  
WATER LEVEL WATER LEVEL
REGION XIII
I. NEW CONSTRUCTION            
A. CONCRETE BRIDGE STRUCTURE            
  1.) PSC GIRDER BRIDGE WITH BORED PILE FOUNDATION                554,906.43             1,302,064.39        
  2.) PSC GIRDER BRIDGE WITH R. C. PILE FOUNDATION                555,905.21             1,308,086.30        
  3.) RCDG BRIDGE WITH R. C. PILE FOUNDATION                380,227.98             1,221,717.91        
  4.) SINGLE SPAN RCDG BRIDGE WITH R. C. PILE FOUNDATION                306,757.08                978,689.77        
        without craneway with structural craneway        
               
B. STEEL BRIDGE STRUCTURE          
  1.) STEEL TRUSS WITH BORED PILE FOUNDATION                678,861.61             1,358,999.50        
  2.) STEEL TRUSS WITH R. C. PILE FOUNDATION                588,619.17             1,278,896.04        
  3.) STEEL GIRDER WITH BORED PILE FOUNDATION                598,049.72             1,350,915.21        
  4.) STEEL GIRDER WITH R. C. PILE FOUNDATION                599,712.95             1,356,808.93        
C. CONCRETE FLYOVER              
  1.) CONCRETE FLYOVER, PSCG TYPE IV, L =30M/35M PER SPAN 529,459.92        
         
II. REPLACEMENT/RECONSTRUCTION          
  1.) RCD GIRDER BRIDGE add 15% to the New Construction of Bridge        
2.) STEEL BRIDGE add 15% to the New Construction of Bridge        
III. BRIDGE REPAIR            
  1.) BRIDGE RETROFITTING        
  a. Retrofitting of Superstucture 431,342.97    
    b. Retrofitting of Substructure and Superstucture 602,582.92    
  2.) REPLACEMENT OF SUPERSTRUCTURE 436,227.08    
  3.) REDECKING 218,033.72    
 

ESTIMATED COST OF BRIDGE STRUCTURE PER LINEAR METER (PESOS)

as of December 2015
Table 2.3
Note:                  
  1.) The cost estimate high/deep water level condition includes Structural Steel Craneway, Structural Steel T-Platform and Cofferdamming of the footing foundation.
  2.) Cost of Replacement/Reconstruction work may be increased by 15% of the new construction cost due to removal of existing bridge structure and provision of detour and traffic management.
  3.) The price of construction materials are based on the regional average prices plus 15% mark-up for the hauling cost (3rd Quarter of CY-2015), equipment rates are based from the latest ACEL Rates (25th Edition) and labor rates are based on the approved labor rates (October 2015).
   
  4.) The estimated unit cost was derived from the assumed typical design of Bridge Structure and may be vary depending on the actual design. 
 
  5.) The retrofitting works is assumed to be designed using glass fiber reinforcement on girders.
 


 

 

Notes:
 

1.) Road data provided are as of  25 November 2015.

2.) The unit of measure for Road Data is kilometers.

3.) No Assessment refers to Road Sections that are either under construction and/or segments with length below the 50-meter gauging length.

4.) National Roads are classified into:

        Primary Roads - roads that connect cities of > 100,000 population.   

        Secondary Roads - other roads which complement with the national arterial roads to provide access to main population and production centers of the country.  

        Tertiary Roads - other existing roads under DPWH which perform a local function. (In the map, these roads are represented only by letters.)

 