C5 Expressway

Project Description: 
  • The C-5 Expressway is an approximate 20 kilometer, six (6) lanes (2x3 lane configuration) elevated expressway from the end of NLEX Segment 8.2 in Quezon City to Cavitex C-5 South Link in Taguig City. It will complete the missing segment of the C-5 Circumferential Expressway alignment, a crucial component of the Metro Manila Urban Expressway Network. 
 
Project Objectives: 

This project aims to:

  • Provide direct access from the NLEX Segment 8.2 in Quezon City to the Manila-Cavite Expressway (CAVITEX) C-5 Southlink (CAVITEX Segment 3) in Taguig City.
  • Support the growing economy of Metro Manila.
  • Provide additional capacity to the road network in Metro Manila
Project Benefits: 
  • To provide motorists seamless expressway travel from north to south and vice versa
  • To reduce usual two-hour travel time during peak periods via C-5 Road to only 15 minutes
  • To serve as viable alternative to reach Metro Manila's major airport Ninoy Aquino International Airport (NAIA), Makati City and Bonifacio Global City business districts, major educational institutions and residential areas.
Project Concessionaire: 
  • NLEX Corporation (formerly MNTC) and Cavitex Infrastructure Corporation (CIC)
Project Cost: 
  • Design, Construction, etc.     : Php 65,296.49 M
  • Right-of-Way Cost                : Php   6,621.33 M
  • Total                                     : Php 71,917.82 M
Project Status: 
  • DPWH confirmed completeness of proposal in accordance with Section 10.5 of the BOT IRR Law on May 9, 2018
  • Ongoing evaluation of the unsolicited proposal in accordance with Section 10.7 of the BOT Law and its IRR and awaiting for the submission of the lacking documents from the proponent
  • For Evaluation 
Project Alignment: