BENGUET 1ST

Road Name / Section ID Route Numbering Start KM End KM
Asin (Km 8)-Nangalisan-Sn Pascual, Tuba, Benguet-La Union Bdry Rd      
S00384LZ   K0258 + (-352) K0275 + 7178
Baguio-Bauang Rd      
S00397LZ 54 K0281 + (-138) K0298 + 069
Baguio-Bontoc Rd      
S00367LZ 204 K0253 + (-586) K0262 + 000
Baguio-Itogon Rd      
S00390LZ   K0254 + (-651) K0268 + 055
Benguet Provl Natl Rd      
S00410LZ      
Benguet-Nueva Vizcaya Rd      
S00382LZ 110 K0254 + (-372) K0319 + 726
City Limit-Sto Tomas Rd      
S00404LZ   K0255 + 000 K0264 + 163
Gurel-Bokod-Kabayan-Buguias-Abatan Rd      
S00379LZ 207 K0318 + (-466) K0342 + 222
S00386LZ 207 K0301 + (-905) K0317 + 533
Itogon-Dalupirip-Sn Manuel Bdry Rd      
S00392LZ   K0265 + (-098) K0278 + 662
Kennon Rd      
S00393LZ 54 K0216 + (-845) K0239 + 593
Kennon-Agat Rd      
S00403LZ   K0217 + (-352) K0217 + 723
Marcos Hi-way      
S00395LZ 208 K0260 + (-686) K0279 + 149
PA Cadre Rd      
S00402LZ      
S00405LZ      
Pico-Lamtang Rd      
S00401LZ   K0255 + (-555) K0261 + 1965
Shilan-Beckel Rd      
S00385LZ   K0261 + (-404) K0263 + 3358
Tawang-Ambiong Rd      
S00387LZ   K0260 + (-609) K0264 + 866

 

DEO / Functional Classification / Road Name / Road Number Condition Rating
Good Fair Poor Bad No Assessment Total
  Primary Roads         23.35         10.04         2.75         4.83            0.88          41.86
1-1 Baguio-Bauang Rd          12.76            4.33             -            0.05             0.06            17.20
  Concrete               -                 -               -            0.05             0.02              0.07
  Asphalt          12.76            4.33             -               -               0.03            17.13
2-2 Kennon Rd          10.59            5.71          2.75          4.78             0.83            24.66
  Concrete            5.57            2.16             -            0.05             0.12              7.90
  Asphalt            5.02            3.55          2.75          4.73             0.71            16.76
  Secondary Roads         92.94         31.71         9.26         1.09            1.33        136.33
3-3 Baguio-Bontoc Rd            4.88            1.01          2.59          1.07             0.07              9.62
  Concrete            1.78            1.01          2.59             -               0.05              5.42
  Asphalt            3.11               -               -            1.07             0.02              4.20
4-4 Benguet-Nueva Vizcaya Rd          54.77            9.35          1.01             -               0.34            65.47
  Concrete          54.77            9.35          1.01             -               0.34            65.47
5-5 Gurel-Bokod-Kabayan-Buguias-Abatan Rd          28.26            9.48          3.32          0.02             0.41            41.50
  Concrete          28.07            9.48          3.31             -               0.41            41.28
  Gravel            0.19               -            0.01          0.02                -                0.22
6-6 Marcos Hi-way            5.03          11.87          2.34             -               0.51            19.75
  Concrete            5.03          10.70          2.12             -                  -              17.85
  Asphalt               -              1.17          0.22             -               0.51              1.90
  Tertiary Roads         44.03         25.88         4.48         7.18            0.93          82.51
A Asin (Km 8)-Nangalisan-Sn Pascual, Tuba, Benguet-La Union Bdry Rd          12.55            3.37          1.30          6.10             0.53            23.85
  Concrete          12.55            3.37          1.06          5.98             0.47            23.43
  Gravel               -                 -            0.24          0.12             0.05              0.41
B Baguio-Itogon Rd            5.35            6.63          1.98          0.16             0.08            14.21
  Concrete            5.35            6.63          1.98          0.16             0.08            14.21
C Benguet Provl Natl Rd            0.21               -            0.16             -                  -                0.37
  Concrete            0.21               -            0.16             -                  -                0.37
D City Limit-Sto Tomas Rd            3.90            4.80             -            0.57                -                9.27
  Concrete            3.90            4.80             -               -                  -                8.70
  Gravel               -                 -               -            0.57                -                0.57
E Itogon-Dalupirip-Sn Manuel Bdry Rd          11.23            1.96             -               -               0.14            13.33
  Concrete          11.23            1.96             -               -               0.14            13.33
F Kennon-Agat Rd            0.35            0.64             -               -               0.08              1.08
  Concrete            0.35            0.64             -               -               0.08              1.08
G PA Cadre Rd               -                 -            0.59          0.11                -                0.70
  Asphalt               -                 -            0.59          0.11                -                0.70
H Pico-Lamtang Rd            4.28            3.77          0.38             -               0.06              8.49
  Concrete            4.28            3.77          0.38             -               0.04              8.46
  Asphalt               -                 -               -               -               0.02              0.02
I Shilan-Beckel Rd            1.48            4.16             -            0.13                -                5.76
  Concrete            1.48            4.16             -            0.13                -                5.76
J Tawang-Ambiong Rd            4.67            0.56          0.07          0.12             0.05              5.48
  Concrete            4.67            0.56          0.07          0.12             0.05              5.48
TOTAL      160.32         67.64       16.50       13.10            3.15        260.70
 


 

Back Home Up Next

Abra / Apayao 1st / Apayao 2nd / Baguio City / Benguet 1st / Benguet 2nd / Ifugao 1st / Ifugao 2nd / Lower Kalinga / Mt. Province / Upper Kalinga

 

Notes:
 

1.) Road data provided are as of  13 December 2016.

2.) The unit of measure for Road Data is kilometers.

3.) No Assessment refers to Road Sections that are either under construction and/or segments with length below the 50-meter gauging length.

4.) National Roads are classified into:

        Primary Roads - roads that connect cities of > 100,000 population.   

        Secondary Roads - other roads which complement with the national arterial roads to provide access to main population and production centers of the country.  

        Tertiary Roads - other existing roads under DPWH which perform a local function. (In the map, these roads are represented only by letters.)

 

For questions regarding this Website contact dpwh_feedback@yahoo.com or the DPWH CFMC .

 

Last updated: 03/09/17.

Disclaimer