Home Up

 

 

Abra
Apayao 1st
Apayao 2nd
Baguio City
Benguet 1st
Benguet 2nd
Ifugao 1st
Ifugao 2nd
Lower Kalinga
Mt. Province
Upper Kalinga

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

IFUGAO 1ST

LIST OF NATIONAL BRIDGES WITH LENGTH, TYPE AND CONDITION
PER DISTRICT ENGINEERING OFFICE
As of 28 December 2016
 
Source: RBIA Generated Report                             Unit of Measure: In Linear Meter 
Bridge No. Bridge ID Bridge Name Bridge Type Overall Condition Length
1 B01361LZ Lamut Br. Permanent Concrete Good 126.84
2 B01709LZ Wang Wang Br. Permanent Concrete Fair 16.55
3 B02198LZ Kinawayanan Br. Permanent Concrete Fair 25.40
4 B02199LZ Bannit Br. Permanent Concrete Fair 22.20
5 B02200LZ Payawan Br. Permanent Concrete Fair 32.00
6 B02201LZ Bunog Br. Permanent Concrete Fair 25.40
7 B02202LZ Halog Br. Permanent Steel Fair 22.45
8 B02203LZ Ibulao Br. Permanent Steel Poor 138.10
9 B02206LZ Bokiawan Br. Permanent Steel Fair 32.30
10 B04589LZ Burnay Br. Permanent Steel Further Assessment 51.44

 


 

Back Home Up Next

Abra / Apayao 1st / Apayao 2nd / Baguio City / Benguet 1st / Benguet 2nd / Ifugao 1st / Ifugao 2nd / Lower Kalinga / Mt. Province / Upper Kalinga

 

Notes:
 

1.) Bridge data provided are as of  28 December 2016.

2.) The unit of measure for Bridge Data is linear meters.

3.) Further Assessment refers to Bridges that are either under the circumstances of on-going construction, under major maintenance work or washed-out.

4.) National Bridges are classified into:

        Permanent Bridges - are bridges that are composed of concrete and steel.

        Temporary Bridges - are bridges consisting of timber and bailey.

For questions regarding this Website contact dpwh_feedback@yahoo.com or the DPWH CFMC .

 

Last updated: 02/28/17.

Disclaimer