Home Up

 

 

Aurora
Bataan 1st
Bataan 2nd
Bulacan 1st
Bulacan 2nd
Nueva Ecija 1st
Nueva Ecija 2nd
Pampanga 1st
Pampanga 2nd
Pampanga 3rd
Tarlac 1st
Tarlac 2nd
Zambales 1st
Zambales 2nd

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

BATAAN 1ST

Department of Public Works and Highways
LIST OF NATIONAL BRIDGES WITH LENGTH, TYPE AND CONDITION
PER DISTRICT ENGINEERING OFFICE
As of 28 December 2016
 
Source: RBIA Generated Report                             Unit of Measure: In Linear Meter 
Bridge No. Bridge ID Bridge Name Bridge Type Overall Condition Length
1 B00047LZ Mambog Br. Permanent Concrete Good 45.60
2 B00052LZ Dona Br. Permanent Concrete Fair 30.00
3 B00055LZ Samal Br. Permanent Concrete Fair 114.00
4 B00058LZ Capitangan Br. Permanent Concrete Poor 27.10
5 B00059LZ Capitangan Br. 1 Permanent Concrete Fair 6.00
6 B00060LZ Pagalanggang Br. Permanent Concrete Fair 28.45
7 B01539LZ Saguing Br. Permanent Concrete Fair 7.40
8 B01540LZ Dulet Br. (cantilever) Permanent Concrete Fair 20.00
9 B01541LZ Tue Br. (cantilever) Permanent Concrete Fair 13.00
10 B01543LZ Cucubog Br. Permanent Concrete Poor 40.35
11 B01545LZ Culis Br. (box culvert) Permanent Concrete Fair 9.60
12 B01546LZ Almario Br. Permanent Concrete Poor 6.70
13 B01548LZ Cataning Br. Permanent Concrete Fair 6.00
14 B01549LZ Hermosa Br. Permanent Concrete Fair 10.00
15 B01550LZ Malimatac Br. Permanent Concrete Poor 8.00
16 B01551LZ Mabuco Br. Permanent Concrete Fair 6.00
17 B01552LZ Tapulao Br. Permanent Concrete Fair 14.00
18 B01553LZ Curing Br. Permanent Concrete Fair 6.00
19 B01554LZ Orani Br. 1 Permanent Concrete Bad 6.00
20 B01556LZ Lalawigan Br. Permanent Concrete Fair 5.35
21 B01557LZ Mabical Br. Permanent Concrete Fair 8.70
22 B01558LZ Samal Br. Permanent Steel Bad 30.40
23 B01560LZ Calaguiman Br. Permanent Concrete Fair 36.00
24 B01561LZ Dulmeg Br. Permanent Concrete Fair 8.00
25 B01564LZ Calaylayan Br. Permanent Concrete Poor 6.00
26 B01565LZ Abucay Br. Permanent Concrete Poor 16.30
27 B01567LZ Capitangan Br. 2 Permanent Concrete Fair 7.25
28 B01569LZ Gatao Br. Permanent Concrete Fair 22.00
29 B01570LZ Marocdoc Br. Permanent Concrete Fair 25.00
30 B01571LZ Limuranin Br. Permanent Concrete Fair 24.00
31 B01572LZ Mauban Br. Permanent Steel Poor 16.00
32 B01573LZ Tuag Br. Permanent Concrete Fair 14.00
33 B01574LZ Bayan Dati Br. Permanent Concrete Poor 22.00
34 B01575LZ Pagsakian Br. 1 Permanent Concrete Fair 30.00
35 B01576LZ Pagsakian Br. 2 Permanent Concrete Fair 30.00
36 B01694LZ Palihan Br. 1 Permanent Concrete Good 150.50
37 B01695LZ Palihan Br. 2 Permanent Concrete Fair 10.80
38 B01698LZ Orani Br. 1 Permanent Concrete Fair 24.17
39 B01699LZ Orani Br. 2 Permanent Concrete Fair 60.00
40 B01701LZ Calaguiman Br. Permanent Concrete Fair 62.00
41 B01702LZ Nandingin Br. Permanent Concrete Fair 60.00
42 B01703LZ Ray Hill Br. Permanent Concrete Fair 60.00
43 B01704LZ Mabatang Br. Permanent Concrete Fair 45.00
44 B01705LZ Calaylayan Br. Permanent Concrete Fair 45.10
45 B01706LZ Gumpay Br. Permanent Concrete Fair 45.10
46 B01707LZ Salian Br. Permanent Concrete Fair 26.10
47 B04465LZ Paroba Br. Permanent Concrete Good 8.50
48 B04466LZ Dila-Dila Br. Permanent Concrete Good 24.00
49 B04467LZ Tabacan Br. Permanent Concrete Good 12.05
50 B04587LZ Orani Br. 2 Permanent Concrete Good 43.30
51 B04619LZ Layac Br. 3 Permanent Concrete Good 42.00
52 B04620LZ Balsik Br. 2 Permanent Concrete Good 58.00
53 B04621LZ Layac Br. 1 Permanent Concrete Good 24.00
54 B04622LZ Layac Br. 2 Permanent Concrete Good 24.00
55 B04726LZ Pinulot Br. Permanent Steel Good 48.60

 

 


 

Back Home Up Next

Aurora / Bataan 1st / Bataan 2nd / Bulacan 1st / Bulacan 2nd / Nueva Ecija 1st / Nueva Ecija 2nd / Pampanga 1st / Pampanga 2nd / Pampanga 3rd / Tarlac 1st / Tarlac 2nd / Zambales 1st / Zambales 2nd

 

Notes:
 

1.) Bridge data provided are as of  28 December 2016.

2.) The unit of measure for Bridge Data is linear meters.

3.) Further Assessment refers to Bridges that are either under the circumstances of on-going construction, under major maintenance work or washed-out.

4.) National Bridges are classified into:

        Permanent Bridges - are bridges that are composed of concrete and steel.

        Temporary Bridges - are bridges consisting of timber and bailey.

For questions regarding this Website contact dpwh_feedback@yahoo.com or the DPWH CFMC .

 

Last updated: 02/28/17.

Disclaimer