Home Up

 

 

Abra
Apayao 1st
Apayao 2nd
Baguio City
Benguet 1st
Benguet 2nd
Ifugao 1st
Ifugao 2nd
Lower Kalinga
Mt. Province
Upper Kalinga

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

BENGUET 1ST

Road Name / Section ID Route Numbering Start KM End KM
Asin (Km 8)-Nangalisan-Sn Pascual, Tuba, Benguet-La Union Bdry Rd      
S00384LZ   K0258 + (-352) K0275 + 7178
Baguio-Bauang Rd      
S00397LZ 54 K0281 + (-138) K0298 + 069
Baguio-Bontoc Rd      
S00367LZ 204 K0253 + (-586) K0262 + 000
Baguio-Itogon Rd      
S00390LZ   K0254 + (-651) K0268 + 055
Benguet Provl Natl Rd      
S00410LZ      
Benguet-Nueva Vizcaya Rd      
S00382LZ 110 K0254 + (-372) K0319 + 726
City Limit-Sto Tomas Rd      
S00404LZ   K0255 + 000 K0264 + 163
Gurel-Bokod-Kabayan-Buguias-Abatan Rd      
S00379LZ 207 K0318 + (-466) K0342 + 222
S00386LZ 207 K0301 + (-905) K0317 + 533
Itogon-Dalupirip-Sn Manuel Bdry Rd      
S00392LZ   K0265 + (-098) K0278 + 662
Kennon Rd      
S00393LZ 54 K0216 + (-845) K0239 + 593
Kennon-Agat Rd      
S00403LZ   K0217 + (-352) K0217 + 723
Marcos Hi-way      
S00395LZ 208 K0260 + (-686) K0279 + 149
PA Cadre Rd      
S00402LZ      
S00405LZ      
Pico-Lamtang Rd      
S00401LZ   K0255 + (-555) K0261 + 1965
Shilan-Beckel Rd      
S00385LZ   K0261 + (-404) K0263 + 3358
Tawang-Ambiong Rd      
S00387LZ   K0260 + (-609) K0264 + 866

 

DEO / Functional Classification / Road Name / Road Number Condition Rating
Good Fair Poor Bad No Assessment Total
  Primary Roads         23.35         10.04         2.75         4.83            0.88          41.86
1-1 Baguio-Bauang Rd          12.76            4.33             -            0.05             0.06            17.20
  Concrete               -                 -               -            0.05             0.02              0.07
  Asphalt          12.76            4.33             -               -               0.03            17.13
2-2 Kennon Rd          10.59            5.71          2.75          4.78             0.83            24.66
  Concrete            5.57            2.16             -            0.05             0.12              7.90
  Asphalt            5.02            3.55          2.75          4.73             0.71            16.76
  Secondary Roads         92.94         31.71         9.26         1.09            1.33        136.33
3-3 Baguio-Bontoc Rd            4.88            1.01          2.59          1.07             0.07              9.62
  Concrete            1.78            1.01          2.59             -               0.05              5.42
  Asphalt            3.11               -               -            1.07             0.02              4.20
4-4 Benguet-Nueva Vizcaya Rd          54.77            9.35          1.01             -               0.34            65.47
  Concrete          54.77            9.35          1.01             -               0.34            65.47
5-5 Gurel-Bokod-Kabayan-Buguias-Abatan Rd          28.26            9.48          3.32          0.02             0.41            41.50
  Concrete          28.07            9.48          3.31             -               0.41            41.28
  Gravel            0.19               -            0.01          0.02                -                0.22
6-6 Marcos Hi-way            5.03          11.87          2.34             -               0.51            19.75
  Concrete            5.03          10.70          2.12             -                  -              17.85
  Asphalt               -              1.17          0.22             -               0.51              1.90
  Tertiary Roads         44.03         25.88         4.48         7.18            0.93          82.51
A Asin (Km 8)-Nangalisan-Sn Pascual, Tuba, Benguet-La Union Bdry Rd          12.55            3.37          1.30          6.10             0.53            23.85
  Concrete          12.55            3.37          1.06          5.98             0.47            23.43
  Gravel               -                 -            0.24          0.12             0.05              0.41
B Baguio-Itogon Rd            5.35            6.63          1.98          0.16             0.08            14.21
  Concrete            5.35            6.63          1.98          0.16             0.08            14.21
C Benguet Provl Natl Rd            0.21               -            0.16             -                  -                0.37
  Concrete            0.21               -            0.16             -                  -                0.37
D City Limit-Sto Tomas Rd            3.90            4.80             -            0.57                -                9.27
  Concrete            3.90            4.80             -               -                  -                8.70
  Gravel               -                 -               -            0.57                -                0.57
E Itogon-Dalupirip-Sn Manuel Bdry Rd          11.23            1.96             -               -               0.14            13.33
  Concrete          11.23            1.96             -               -               0.14            13.33
F Kennon-Agat Rd            0.35            0.64             -               -               0.08              1.08
  Concrete            0.35            0.64             -               -               0.08              1.08
G PA Cadre Rd               -                 -            0.59          0.11                -                0.70
  Asphalt               -                 -            0.59          0.11                -                0.70
H Pico-Lamtang Rd            4.28            3.77          0.38             -               0.06              8.49
  Concrete            4.28            3.77          0.38             -               0.04              8.46
  Asphalt               -                 -               -               -               0.02              0.02
I Shilan-Beckel Rd            1.48            4.16             -            0.13                -                5.76
  Concrete            1.48            4.16             -            0.13                -                5.76
J Tawang-Ambiong Rd            4.67            0.56          0.07          0.12             0.05              5.48
  Concrete            4.67            0.56          0.07          0.12             0.05              5.48
TOTAL      160.32         67.64       16.50       13.10            3.15        260.70
 


 

Back Home Up Next

Abra / Apayao 1st / Apayao 2nd / Baguio City / Benguet 1st / Benguet 2nd / Ifugao 1st / Ifugao 2nd / Lower Kalinga / Mt. Province / Upper Kalinga

 

Notes:
 

1.) Road data provided are as of  13 December 2016.

2.) "No Assessment" refers to Road Sections that are either under construction and/or segments with length below the 50-meter gauging length.

4.) National Roads are classified into:

        Primary Roads - roads that connect major cities with population of  at least 100,000.   

        Secondary Roads - other roads which complement the national primary roads to provide access to main population and production centers of the country.  

        Tertiary Roads - other existing roads under DPWH which perform a local function. (In the map, these roads are represented only by letters.)

 

For questions regarding this website contact dpwh_feedback@yahoo.com or the DPWH CFMC .

 

Last updated: 03/27/17.

Disclaimer