Home Up

 

 

Bacolod City
Negros Occ. 1st
Negros Occ. 2nd
Negros Occ. 3rd
Negros Occ. 4th
Negros Oriental 1st
Negros Oriental 2nd
Negros Oriental 3rd

 

 

NEGROS OCCIDENTAL 4TH

LIST OF NATIONAL BRIDGES WITH LENGTH, TYPE AND CONDITION
PER DISTRICT ENGINEERING OFFICE
As of 28 December 2016
 
Source: RBIA Generated Report                             Unit of Measure: In Linear Meter 
Bridge No. Bridge ID Bridge Name Bridge Type Overall Condition Length
1 B00194NR Sibud Br. 2 Permanent Concrete Fair 18.08
2 B00195NR Bago Br. Permanent Concrete Fair 270.00
3 B00197NR Antipolo Br. Permanent Concrete Good 12.80
4 B00345NR Sibud Br. 1 Permanent Concrete Fair 12.60
5 B00346NR Banawang Br. Permanent Concrete Good 45.62
6 B00347NR Bagonawa Br. Permanent Concrete Good 18.50
7 B00348NR Bakyas Br. Permanent Concrete Fair 9.52
8 B00349NR Candaguit Br. Permanent Concrete Fair 37.00
9 B00350NR Marayo Br. Permanent Concrete Fair 54.54
10 B00359NR Himuang Br. 2 Permanent Concrete Poor 15.70
11 B00365NR Maragandang Br. Permanent Steel Fair 41.40
12 B00366NR Kipot Br. Permanent Steel Fair 37.80
13 B00368NR Quezon Br. Permanent Concrete Good 150.54
14 B00369NR Hinalu-an Br. Permanent Concrete Fair 18.90
15 B00370NR Canman-ug Br. Permanent Steel Good 17.50
16 B00371NR Najalin Br. Permanent Steel Good 50.55
17 B00380NR Hinalu-an Br. Permanent Concrete Poor 7.70
18 B00394NR Tibsok Br. Permanent Concrete Fair 156.00
19 B00395NR Pontevedra Br. Permanent Concrete Good 136.00
20 B00431NR Patik Br. Permanent Concrete Fair 8.20
21 B00436NR Pula Br. Permanent Steel Fair 47.00
22 B00466NR Puntataytay Br. Permanent Concrete Good 12.40
23 B00467NR Taloc Br. Permanent Concrete Good 18.20
24 B00478NR Calumangan Br. Permanent Concrete Good 42.00

 


 

Back Home Up Next

Bacolod City / Negros Occ. 1st / Negros Occ. 2nd / Negros Occ. 3rd / Negros Occ. 4th / Negros Oriental 1st / Negros Oriental 2nd / Negros Oriental 3rd

 

Notes:
 

1.) Bridge data provided are as of  28 December 2016.

2.) The unit of measure for Bridge Data is linear meters.

3.) Further Assessment refers to Bridges that are either under the circumstances of on-going construction, under major maintenance work or washed-out.

4.) National Bridges are classified into:

        Permanent Bridges - are bridges that are composed of concrete and steel.

        Temporary Bridges - are bridges consisting of timber and bailey.

For questions regarding this Website contact dpwh_feedback@yahoo.com or the DPWH CFMC .

 

Last updated: 03/18/17.

Disclaimer