Procurement - Civil Works

 

Bidding Schedule

 
 

A)

NAME OF PROJECT

B)

FUND

C)

IMPLEMENTING OFFICE

D)

PROJECT COST (Million Php)

PROJECT DESCRIPTION

1)

TENTATIVE SCHEDULE OF BIDDING

2)

REMARKS

A) CONTRACT PACKAGE I, URGENT BRIDGES CONSTRUCTION PROJECT FOR RURAL DEVELOPMENT
B) JBIC
C) UBCP
D) 2,500
  CONSTRUCTION OF FOUR BRIDGES, CONST. OF THIRTEEN SMALL SPAN BRIDGES  

 

1)

6/2/2006 

2)   
A) CONTRACT PACKAGE B.2- MARCOS HIGHWAY (EVANGELISTA TO MASINAG) PASIG CITY, MARIKINA CITY, ANTIPOLO CITY, CAINTA RIZAL
B) WB
C) URPO
D) 810
  MMURTRIP, PHASE I STRUCTURE EXCAVATION, CONSTRUCTION OF ASPHALT AND CONCRETE PAVEMENTS AND LAYING/PRECASTING OF RCBC.  

 

1)

5/5/2006 

2)   
A) CONTRACT PACKAGE C.6- 10TH AVENUE, CITY OF CALOOCAN
B) WB
C) URPO
D) 91
  MMURTRIP, PHASE II CONCRETE PAVING/RE- BLOCKING, LAYING OF CEMENT TREATED AGGREGATE BASE COURSE AND CONST. OF DRAINAGE STRUCTURES.  

 

1)

5/4/2006 

2)   
A) CONTRACT PACKAGE C.3- SECONDARY ROADS (PEDRO GIL/NEW PANADEROS/ TAYUMAN/ M. DELA FUENTE/ J. FAJARDO, CITY OF MANILA
B) WB
C) URPO
D) 304
  MMURTRIP, PHASE II CONCRETE PAVING/RE- BLOCKING, LAYING OF CEMENT TREATED AGGREGATE BASE COURSE AND CONST. OF DRAINAGE STRUCTURES.  

 

1)

4/27/2006 

2)   
A) CONSTRUCTION OF SALTAN BRIDGE AND APPROACHES, BRGY. PINUKPUK, PINUKPUK, KALINGA
B) GOP
C) SBP
D) 77
  ALONG CALANAN-ABBUT RD. STA. 522+525.00, BRGY. PINUKPUK, KALINGA, CONST. OF SUBSTRUCTURE OF TWO ABUTMENTS AND TWO PIERS, SUPERSTRUCTURE INSTALLATION, DRAINAGE AND SLOPE PROTECTION WORKS  

 

1)

4/25/2006 

2)   
A) CONTRACT PACKAGE IV LOOC-ODIONGAN-SAN ANDRES ROAD, PROVINCE OF ROMBLON
B) JBIC
C) RRNDP
D) 412
  IMPRV./REHAB. OF 37.26 KMS PCCP, AC PAVEMENT, GRAVEL AND EARTH SURFACE. CONST. OF DRAINAGE AND SLOPE PROTECTION STRUCTURES.  

 

1)

4/24/2006 

2)   
A) CONSTRUCTION OF OPAO BRIDGE AND APPROACHES, BRGY. OPAO, DAPITAN CITY, ZAMBOANGA DEL NORTE
B) GOP
C) SBP
D) 83
  ALONG OROQUIETA-DAPITAN-DIPOLOG NATIONAL RD. STA. 1806+387.013 CONST. OF SUBSTRUCTURE OF TWO ABUTMENTS AND ONE PIER, SUPERSTRUCTURE HAULING AND INSTALLATION, DRAINAGE AND SLOPE PROTECTION WORKS  

 

1)

4/18/2006 

2)   
A) CW-RU-1.6 A (SAN ENRIQUE-VALLEHERMOSO RD. LA CASTELLANA-CANLAON SEC. 1ST. NAT'L. RD. IMPROV. PROJ.
B) WB
C) IBRD
D) 570
  LOCATED APPROXIMATELY 65 KMS SOUTHEAST OF BACOLOD. CONST. OF PCCP RD. 6.70 M WIDE W/ 1.50 M. WIDE SUBBASE SHOULDERS, CONST. OF CEMENT TREATED BASE, IMPRV. OF DRAINAGE STRUCTURES, & 8 BRIDGES.  

 

1)

4/17/2006 

2)   
A) CW-RU-1.6 B (KABANKALAN-BASAY RD. HINOBAAN-BASAY SECT.) 1ST. NAT'L. RD. IMPROV. PROJ.
B) WB
C) IBRD
D) 550
  LOCATED APPROXIMATELY 160 KMS SOUTH OF BACOLOD. CONST. OF PCCP RD. 6.70 M WIDE W/ 1.50 M WIDE SUBBASE SHOULDERS, IMPROV. OF DRAINAGE STRUCTURES, CONST. OF MECHANICALLY STABILIZED EARTH WALL & REPLACEMENT OF FIVE BRIDGES.  

 

1)

4/17/2006 

2)   
A) CONTRACT PACKAGE III, LIBON-MAROCMOC-PANTAO ROAD, ALBAY SECTION
B) JBIC
C) RRNDP
D) 137
  IMPROV. /REHAB. OF 16.45 KMS. PCCP AND GRAVEL SURFACE. CONSTRUCTION AND IMPROV. OF DRAINAGE AND SLOPE PROTECTION STRUCTURES  

 

1)

4/5/2006 

2)   
A) CONTRACT PACKAGE C.5- QUIRINO HIGHWAY (NLEX JUNCTION TO NORTH FAIRVIEW, QUEZON CITY)
B) WB
C) URPO
D) 617
  MMURTRIP, PHASE II CONCRETE PAVING/RE- BLOCKING, LAYING OF CEMENT TREATED AGGREGATE BASE COURSE AND CONST. OF DRAINAGE STRUCTURES.  

 

1)

3/10/2006 

2)   
A) CW-RU-1.4B (REHABILITATION OF SURIGAO-DAVAO COASTAL ROAD, MARIHATAG-BAROBO/TAGBINA- HINATUAN SECT.
B) WB
C) IBRD
D) 940
  LOCATED APPROX. 30 KMS SOUTH OF TANDAG TOWN, SURIGAO DEL SUR. CONST. OF NEW PCCP ROAD, IMPROV. OF DRAINAGE STRUCTURES, PROVISION OF ROAD PROTECTION WORKS, & CONST. OF 17 BRIDGES.  

 

1)

2/15/2006 

2)  POSRPONED INDEFINITELY
A) Contract Package III, Philippine-Japan Frienship Highway Rehabilitation Project (Visayas Section, Phase II) under Arterial Road Links Development Project (Phase VI).
B) JBIC
C) PJHL
D) 629.82 M
  Calbayog-Gatanguit (Km 732+600 to Km 785+341.60), Samar Province  

 

1)

10/6/2005 

2)   
A) Contract Package IV, Philippine-Japan Frienship Highway Rehabilitation Project (Visayas Section, Phase II) under Arterial Road Links Development Project (Phase VI).
B) JBIC
C) PJHL
D) 734.4 M
  Gatanguit-Calbiga (Km 785+341.60 to Km 849+000.00), Samar Province  

 

1)

10/6/2005 

2)   
A) CONTRACT PACKAGE C.5- QUIRINO HIGHWAY
B) IBRD
C) URPO
D) 616.9
  CP C.5 - QUIRINO HIGHWAY (NLEX JUNCTION TO NORTH FAIRVIEW, QUEZON CITY  

 

1)

9/15/2005 

2)   
A) HELP FOR CATUBIG AGRICULTURAL ADVANCEMENTY PROJECT (HCAAP)
B) JBIC
C) REG. VIII
D) 333
  HELP FOR CATUBIG AGRICULTURAL ADVANCEMENTY PROJECT (HCAAP) NORTHERN SAMAR  

 

1)

9/6/2005 

2)   
A) Contract Package III, Philippine-Japan Frienship Highway Rehabilitation Project (Visayas Section, Phase II) under Arterial Road Links Development Project (Phase VI).
B) JBIC
C) PJHL
D) 629.82
  Calbayog-Gatanguit (Km 732+600 to Km 785+341.60), Samar Province  

 

1)

9/5/2005 

2)   
A) Contract Package IV, Philippine-Japan Frienship Highway Rehabilitation Project (Visayas Section, Phase II) under Arterial Road Links Development Project (Phase VI).
B) JBIC
C) PJHL
D) 734.4
  Gatanguit-Calbiga (Km 785+341.60 to Km 849+000.00), Samar Province  

 

1)

9/5/2005 

2)   
A) COMPLETION OF THREE (3) STOREY BLDG. TONDO MED. CENTER BLDG.
B) GOP
C) SB-PMO
D) 5
  COMPLETION OF THREE (3) STOREY BLDG. TONDO MED. CENTER BLDG. BALUT, TONDO, MANILA  

 

1)

8/23/2005 

2)   
A) CONTRACT PACKAGE II, MALAGA-CALBAYOG SECTION, SAMAR PROVINCE
B) JBIC
C) PJHL
D) 537
  STATION LIMIT KM. 694+500.00-KM. 731+354.54, LENGTH OF PROJECT 36.76 KMS. ROAD WIDENING  

 

1)

8/18/2005 

2)  POSRPONED INDEFINITELY
A) Contract Package II, Philippine-Japan Frienship Highway Rehabilitation Project (Visayas Section, Phase II) under Arterial Road Links Development Project (Phase VI).
B) JBIC
C) PJHL
D) 536.9
  Malaga-Calbayog Section (Km. 694+500.00-Km. 731+354.54), Northern Samar  

 

1)

8/18/2005 

2)   
A) Contract Package I, Philippine-Japan Frienship Highway Rehabilitation Project (Visayas Section, Phase II) under Arterial Road Links Development Project (Phase VI).
B) JBIC
C) PJHL
D) 523.5
  Allen-Malaga Section (Km. 658+804.55-Km. 694+500.00 ), Northern Samar  

 

1)

8/18/2005 

2)   
A) Contract Package I, Philippine-Japan Frienship Highway Rehabilitation Project (Visayas Section, Phase II) under Arterial Road Links Development Project (Phase VI).
B) JBIC
C) PJHL
D) 523.5 M
  Allen-Malaga Section (Km. 658+804.55-Km. 694+500.00 ), Northern Samar  

 

1)

8/18/2005 

2)   
A) Contract Package I, Iloilo Flood Control Project (Phase II)
B) JBIC
C) MFCDP
D) 1820.97 M
  Construction of Jaro Floodway and improvement of Tigum and Aganan Rivers  

 

1)

8/8/2005 

2)   
A) Contract Package I, Iloilo Flood Control Project (Phase II)
B) JBIC
C) MFCDP
D) 1820.97
  Construction of Jaro Floodway and improvement of Tigum and Aganan Rivers  

 

1)

8/8/2005 

2)   
A) Contract Package I, Iloilo Flood Control Project (Phase II)
B) JBIC
C) MFCDP
D) 1820.97 M
  Construction of Jaro Floodway and improvement of Tigum and Aganan Rivers  

 

1)

6/23/2005 

2)   
A) The Metro Manila Urban Transport Integration Project (MMURTRIP), Phase II
B) WB
C) URPO
D) 564.1
  CP C4, South Luzon Expressway Service Roads (East and West)  

 

1)

6/23/2005 

2)  (Postponed Indefinitely)
A) The Metro Manila Urban Transport Integration Project (MMURTRIP), Phase II
B) WB
C) URPO
D) 564.1 M
  CP C4, South Luzon Expressway Service Roads (East and West)  

 

1)

6/23/2005 

2)   
A) Const. of Segment 3B-2, Cebu South Coastal Rd.
B) JBIC
C) MCDP III-CSCR
D) 1680 M
  Construction of Subway (Tunnel) Section  

 

1)

5/31/2005 

2)   
A) Const. of Segment 3B-2, Cebu South Coastal Rd.
B) JBIC
C) MCDP III-CSCR
D) 1680
  Construction of Subway (Tunnel) Section  

 

1)

5/31/2005 

2)   (Postponed Indefinitely)
A) CONST. OF SEGMENT 3B-2, CEBU SOUTH COASTAL ROAD.
B) JBIC
C)  
D)  
  CONSTRUCTION OF SUBWAY (TUNNEL) SECTION  

 

1)

5/31/2005 

2)   
A) Contract Package IV-A, Rural Road Network Development Project (Phase II)
B) JBIC
C) RRNDP
D) 59.46 M