A) |
CONTRACT PACKAGE I, URGENT BRIDGES CONSTRUCTION PROJECT FOR RURAL DEVELOPMENT |
|
B) |
JBIC |
|
C) |
UBCP |
|
D) |
2,500 |
|
| |
CONSTRUCTION OF FOUR BRIDGES, CONST. OF THIRTEEN SMALL SPAN BRIDGES |
|
|
|
|
A) |
CONTRACT PACKAGE B.2- MARCOS HIGHWAY (EVANGELISTA TO MASINAG) PASIG CITY, MARIKINA CITY, ANTIPOLO CITY, CAINTA RIZAL |
|
B) |
WB |
|
C) |
URPO |
|
D) |
810 |
|
| |
MMURTRIP, PHASE I STRUCTURE EXCAVATION, CONSTRUCTION OF ASPHALT AND CONCRETE PAVEMENTS AND LAYING/PRECASTING OF RCBC. |
|
|
|
|
A) |
CONTRACT PACKAGE C.6- 10TH AVENUE, CITY OF CALOOCAN |
|
B) |
WB |
|
C) |
URPO |
|
D) |
91 |
|
| |
MMURTRIP, PHASE II CONCRETE PAVING/RE- BLOCKING, LAYING OF CEMENT TREATED AGGREGATE BASE COURSE AND CONST. OF DRAINAGE STRUCTURES. |
|
|
|
|
A) |
CONTRACT PACKAGE C.3- SECONDARY ROADS (PEDRO GIL/NEW PANADEROS/ TAYUMAN/ M. DELA FUENTE/ J. FAJARDO, CITY OF MANILA |
|
B) |
WB |
|
C) |
URPO |
|
D) |
304 |
|
| |
MMURTRIP, PHASE II CONCRETE PAVING/RE- BLOCKING, LAYING OF CEMENT TREATED AGGREGATE BASE COURSE AND CONST. OF DRAINAGE STRUCTURES. |
|
|
|
|
A) |
CONSTRUCTION OF SALTAN BRIDGE AND APPROACHES, BRGY. PINUKPUK, PINUKPUK, KALINGA |
|
B) |
GOP |
|
C) |
SBP |
|
D) |
77 |
|
| |
ALONG CALANAN-ABBUT RD. STA. 522+525.00, BRGY. PINUKPUK, KALINGA, CONST. OF SUBSTRUCTURE OF TWO ABUTMENTS AND TWO PIERS, SUPERSTRUCTURE INSTALLATION, DRAINAGE AND SLOPE PROTECTION WORKS |
|
|
|
|
A) |
CONTRACT PACKAGE IV LOOC-ODIONGAN-SAN ANDRES ROAD, PROVINCE OF ROMBLON |
|
B) |
JBIC |
|
C) |
RRNDP |
|
D) |
412 |
|
| |
IMPRV./REHAB. OF 37.26 KMS PCCP, AC PAVEMENT, GRAVEL AND EARTH SURFACE. CONST. OF DRAINAGE AND SLOPE PROTECTION STRUCTURES. |
|
|
|
|
A) |
CONSTRUCTION OF OPAO BRIDGE AND APPROACHES, BRGY. OPAO, DAPITAN CITY, ZAMBOANGA DEL NORTE |
|
B) |
GOP |
|
C) |
SBP |
|
D) |
83 |
|
| |
ALONG OROQUIETA-DAPITAN-DIPOLOG NATIONAL RD. STA. 1806+387.013 CONST. OF SUBSTRUCTURE OF TWO ABUTMENTS AND ONE PIER, SUPERSTRUCTURE HAULING AND INSTALLATION, DRAINAGE AND SLOPE PROTECTION WORKS |
|
|
|
|
A) |
CW-RU-1.6 A (SAN ENRIQUE-VALLEHERMOSO RD. LA CASTELLANA-CANLAON SEC. 1ST. NAT'L. RD. IMPROV. PROJ. |
|
B) |
WB |
|
C) |
IBRD |
|
D) |
570 |
|
| |
LOCATED APPROXIMATELY 65 KMS SOUTHEAST OF BACOLOD. CONST. OF PCCP RD. 6.70 M WIDE W/ 1.50 M. WIDE SUBBASE SHOULDERS, CONST. OF CEMENT TREATED BASE, IMPRV. OF DRAINAGE STRUCTURES, & 8 BRIDGES. |
|
|
|
|
A) |
CW-RU-1.6 B (KABANKALAN-BASAY RD. HINOBAAN-BASAY SECT.) 1ST. NAT'L. RD. IMPROV. PROJ. |
|
B) |
WB |
|
C) |
IBRD |
|
D) |
550 |
|
| |
LOCATED APPROXIMATELY 160 KMS SOUTH OF BACOLOD. CONST. OF PCCP RD. 6.70 M WIDE W/ 1.50 M WIDE SUBBASE SHOULDERS, IMPROV. OF DRAINAGE STRUCTURES, CONST. OF MECHANICALLY STABILIZED EARTH WALL & REPLACEMENT OF FIVE BRIDGES. |
|
|
|
|
A) |
CONTRACT PACKAGE III, LIBON-MAROCMOC-PANTAO ROAD, ALBAY SECTION |
|
B) |
JBIC |
|
C) |
RRNDP |
|
D) |
137 |
|
| |
IMPROV. /REHAB. OF 16.45 KMS. PCCP AND GRAVEL SURFACE. CONSTRUCTION AND IMPROV. OF DRAINAGE AND SLOPE PROTECTION STRUCTURES |
|
|
|
|
A) |
CONTRACT PACKAGE C.5- QUIRINO HIGHWAY (NLEX JUNCTION TO NORTH FAIRVIEW, QUEZON CITY) |
|
B) |
WB |
|
C) |
URPO |
|
D) |
617 |
|
| |
MMURTRIP, PHASE II CONCRETE PAVING/RE- BLOCKING, LAYING OF CEMENT TREATED AGGREGATE BASE COURSE AND CONST. OF DRAINAGE STRUCTURES. |
|
|
|
|
A) |
CW-RU-1.4B (REHABILITATION OF SURIGAO-DAVAO COASTAL ROAD, MARIHATAG-BAROBO/TAGBINA- HINATUAN SECT. |
|
B) |
WB |
|
C) |
IBRD |
|
D) |
940 |
|
| |
LOCATED APPROX. 30 KMS SOUTH OF TANDAG TOWN, SURIGAO DEL SUR. CONST. OF NEW PCCP ROAD, IMPROV. OF DRAINAGE STRUCTURES, PROVISION OF ROAD PROTECTION WORKS, & CONST. OF 17 BRIDGES. |
|
|
| 1) |
2/15/2006
|
| 2) |
POSRPONED INDEFINITELY |
|
|
A) |
Contract Package III, Philippine-Japan Frienship Highway Rehabilitation Project (Visayas Section, Phase II) under Arterial Road Links Development Project (Phase VI). |
|
B) |
JBIC |
|
C) |
PJHL |
|
D) |
629.82 M |
|
| |
Calbayog-Gatanguit (Km 732+600 to Km 785+341.60), Samar Province |
|
|
|
|
A) |
Contract Package IV, Philippine-Japan Frienship Highway Rehabilitation Project (Visayas Section, Phase II) under Arterial Road Links Development Project (Phase VI). |
|
B) |
JBIC |
|
C) |
PJHL |
|
D) |
734.4 M |
|
| |
Gatanguit-Calbiga (Km 785+341.60 to Km 849+000.00), Samar Province |
|
|
|
|
A) |
CONTRACT PACKAGE C.5- QUIRINO HIGHWAY |
|
B) |
IBRD |
|
C) |
URPO |
|
D) |
616.9 |
|
| |
CP C.5 - QUIRINO HIGHWAY (NLEX JUNCTION TO NORTH FAIRVIEW, QUEZON CITY |
|
|
|
|
A) |
HELP FOR CATUBIG AGRICULTURAL ADVANCEMENTY PROJECT (HCAAP) |
|
B) |
JBIC |
|
C) |
REG. VIII |
|
D) |
333 |
|
| |
HELP FOR CATUBIG AGRICULTURAL ADVANCEMENTY PROJECT (HCAAP) NORTHERN SAMAR |
|
|
|
|
A) |
Contract Package III, Philippine-Japan Frienship Highway Rehabilitation Project (Visayas Section, Phase II) under Arterial Road Links Development Project (Phase VI). |
|
B) |
JBIC |
|
C) |
PJHL |
|
D) |
629.82 |
|
| |
Calbayog-Gatanguit (Km 732+600 to Km 785+341.60), Samar Province |
|
|
|
|
A) |
Contract Package IV, Philippine-Japan Frienship Highway Rehabilitation Project (Visayas Section, Phase II) under Arterial Road Links Development Project (Phase VI). |
|
B) |
JBIC |
|
C) |
PJHL |
|
D) |
734.4 |
|
| |
Gatanguit-Calbiga (Km 785+341.60 to Km 849+000.00), Samar Province |
|
|
|
|
A) |
COMPLETION OF THREE (3) STOREY BLDG. TONDO MED. CENTER BLDG. |
|
B) |
GOP |
|
C) |
SB-PMO |
|
D) |
5 |
|
| |
COMPLETION OF THREE (3) STOREY BLDG. TONDO MED. CENTER BLDG. BALUT, TONDO, MANILA |
|
|
|
|
A) |
CONTRACT PACKAGE II, MALAGA-CALBAYOG SECTION, SAMAR PROVINCE |
|
B) |
JBIC |
|
C) |
PJHL |
|
D) |
537 |
|
| |
STATION LIMIT KM. 694+500.00-KM. 731+354.54, LENGTH OF PROJECT 36.76 KMS. ROAD WIDENING |
|
|
| 1) |
8/18/2005
|
| 2) |
POSRPONED INDEFINITELY |
|
|
A) |
Contract Package II, Philippine-Japan Frienship Highway Rehabilitation Project (Visayas Section, Phase II) under Arterial Road Links Development Project (Phase VI). |
|
B) |
JBIC |
|
C) |
PJHL |
|
D) |
536.9 |
|
| |
Malaga-Calbayog Section (Km. 694+500.00-Km. 731+354.54), Northern Samar |
|
|
|
|
A) |
Contract Package I, Philippine-Japan Frienship Highway Rehabilitation Project (Visayas Section, Phase II) under Arterial Road Links Development Project (Phase VI). |
|
B) |
JBIC |
|
C) |
PJHL |
|
D) |
523.5 |
|
| |
Allen-Malaga Section (Km. 658+804.55-Km. 694+500.00 ), Northern Samar |
|
|
|
|
A) |
Contract Package I, Philippine-Japan Frienship Highway Rehabilitation Project (Visayas Section, Phase II) under Arterial Road Links Development Project (Phase VI). |
|
B) |
JBIC |
|
C) |
PJHL |
|
D) |
523.5 M |
|
| |
Allen-Malaga Section (Km. 658+804.55-Km. 694+500.00 ), Northern Samar |
|
|
|
|
A) |
Contract Package I, Iloilo Flood Control Project (Phase II) |
|
B) |
JBIC |
|
C) |
MFCDP |
|
D) |
1820.97 M |
|
| |
Construction of Jaro Floodway and improvement of Tigum and Aganan Rivers |
|
|
|
|
A) |
Contract Package I, Iloilo Flood Control Project (Phase II) |
|
B) |
JBIC |
|
C) |
MFCDP |
|
D) |
1820.97 |
|
| |
Construction of Jaro Floodway and improvement of Tigum and Aganan Rivers |
|
|
|
|
A) |
Contract Package I, Iloilo Flood Control Project (Phase II) |
|
B) |
JBIC |
|
C) |
MFCDP |
|
D) |
1820.97 M |
|
| |
Construction of Jaro Floodway and improvement of Tigum and Aganan Rivers |
|
|
|
|
A) |
The Metro Manila Urban Transport Integration Project (MMURTRIP), Phase II |
|
B) |
WB |
|
C) |
URPO |
|
D) |
564.1 |
|
| |
CP C4, South Luzon Expressway Service Roads (East and West) |
|
|
| 1) |
6/23/2005
|
| 2) |
(Postponed Indefinitely) |
|
|
A) |
The Metro Manila Urban Transport Integration Project (MMURTRIP), Phase II |
|
B) |
WB |
|
C) |
URPO |
|
D) |
564.1 M |
|
| |
CP C4, South Luzon Expressway Service Roads (East and West) |
|
|
|
|
A) |
Const. of Segment 3B-2, Cebu South Coastal Rd. |
|
B) |
JBIC |
|
C) |
MCDP III-CSCR |
|
D) |
1680 M |
|
| |
Construction of Subway (Tunnel) Section |
|
|
|
|
A) |
Const. of Segment 3B-2, Cebu South Coastal Rd. |
|
B) |
JBIC |
|
C) |
MCDP III-CSCR |
|
D) |
1680 |
|
| |
Construction of Subway (Tunnel) Section |
|
|
| 1) |
5/31/2005
|
| 2) |
(Postponed Indefinitely) |
|
|
A) |
CONST. OF SEGMENT 3B-2, CEBU SOUTH COASTAL ROAD. |
|
B) |
JBIC |
|
C) |
|
|
D) |
|
|
| |
CONSTRUCTION OF SUBWAY (TUNNEL) SECTION |
|
|
|
|
A) |
Contract Package IV-A, Rural Road Network Development Project (Phase II) |
|
B) |
JBIC |
|
C) |
RRNDP |
|
D) |
59.46 M |
|