| A) |
PLANNING SERVICE |
| B) |
NRIMP |
| C) |
Single Source Selection |
|
| |
Advisory Services for the Technical
Assistance to Strengthen the Local
Consulting & Contracting Industry |
|
|
| 1) |
Alicia A. Tiongson |
|
2) |
|
| 3) |
4/30/2003 |
|
|
| A) |
PMO-URPO |
| B) |
GOP |
| C) |
Competitive Selection (Quality Based Selection) |
|
| |
Consulting Services for the External Monitoring for the Marikina Bridge and Access Road Project, MMURTRIP |
|
|
| 1) |
Madecor Environmental Management System Inc. |
|
2) |
|
| 3) |
4/10/2003 |
|
|
| A) |
PMO-URPO |
| B) |
GOP |
| C) |
Competitive Selection (Quality Based Selection) |
|
| |
Consulting Services for the Independent land Appraisal for the
Marikina Bridge and Access Road Project, MMURTRIP |
|
|
| 1) |
Value Specialists Property Appraisal |
|
2) |
|
| 3) |
4/8/2003 |
|
|
| A) |
PMO-MFC |
| B) |
JBIC 25th Special Yen Loan |
| C) |
Competitive Selection (Quality Based Selection) |
|
| |
Consulting Services for the Iloilo Flood Control Project, Phase II, Component II. |
|
|
| 1) |
CTI Engineering Co. Ltd. in ass with Woodfields Consultant, Inc. and Pertconsult |
|
2) |
|
Y 150,538,101.00
|
|
P 123,963,796.00
|
|
P 8,448,949.00
|
|
| 3) |
3/25/2003 |
|
|
| A) |
PMO-URPO |
| B) |
JBIC Loan No. PH-P218 |
| C) |
Direct Negotiation |
|
| |
Consulting Services for the Construction Supervision of EDSA/North Ave/West Ave Interchange & EDSA/Roosevelt Interchange Project |
|
|
| 1) |
KATAHIRA & Engineers Int'l. in ass with Pro consult Inc & United Technologies Inc. |
|
2) |
|
Y 306,537,750.00
|
|
P 57,104,775.00
|
|
P 5,327,910.00
|
|
| 3) |
1/13/2003 |
|
|
| A) |
PMO-RRNDP |
| B) |
JBIC Loan No. PH-P162 |
| C) |
Competitive Selection (Quality Based Selection) |
|
| |
Consulting Services for the Detailed Engineering & Construction Supervision of Rural Road Network Development Project, Phase III |
|
|
| 1) |
Katahira & Engineers Intl. in ass with Development Engineering Management Corp, Inc. Multi-Infra Konsult Inc., Pro-Consult Inc., Techniks Group Corp & United Technologies |
|
2) |
|
Y 445,642,684.00
|
|
P 237,507,677.34
|
|
P 12,271,100.00
|
|
| 3) |
1/9/2003 |
|
|
| A) |
PMO-URPO |
| B) |
JBIC Loan No. PH-P218 |
| C) |
Direct Negotiation |
|
| |
Consulting Services for the Construction Supervision of C-5/Lanuza St-Julia Vargas Ave., Interchange & C-5/Kalayaan Ave. (R-4)
Inerchange Projects) |
|
|
| 1) |
Nippon Engineering Consultant in ass with DCCD Engineering Corp & Perconsult Int'l |
|
2) |
|
Y 116,241,680.00
|
|
P 27,306,330.00
|
|
P 2,625,720.00
|
|
| 3) |
12/19/2002 |
|
|
| A) |
PMO-MFC |
| B) |
JBIC Loan No. PH-P230 |
| C) |
Direct Negotiation |
|
| |
Consulting Services for the
Construction Supervision of Iloilo Flood Control Project, Phase II, Component I. |
|
|
| 1) |
CTI Engineering Co. Ltd. in ass with Woodfields Consultant, Inc. and Basic Technology & Management Corp. |
|
2) |
|
Y 444,164,679.00
|
|
P 144,681,310.00
|
|
P 3,599,400.00
|
|
| 3) |
10/28/2002 |
|
|
| A) |
PMO-MFC |
| B) |
JBIC Loan No. PH-P212 |
| C) |
Direct Negotiation |
|
| |
Consulting Services for the External
Monitoring for the External Monitoring for Resettlement and land Acquisition under the KAMANAVA Area Flood Control and Drainage System I Improvement Project |
|
|
| 1) |
Institute on Church and Social Isuues |
|
2) |
|
| 3) |
4/25/2002 |
|
|
| A) |
PMO-KFAED |
| B) |
Kuwait Fund for Arab Economic Development Loan No. 541 |
| C) |
Competitive Selection (Quality Based Selection) |
|
| |
Consulting Services for the Construction Supervision of Mindanao Second Roads Improvement Project |
|
|
| 1) |
United Consulting Group, Renardet S.A. and Design Science Inc |
|
2) |
|
$ 688,800.00
|
|
P 60,079,350.00
|
|
P 4,659,600.00
|
|
| 3) |
4/16/2002 |
|
|
| A) |
PMO-PJHL |
| B) |
JBIC Loan No
PH-P217 |
| C) |
Competitive Selection (Quality Based Selection) |
|
| |
Consulting Services for the Detailed
Engineering and Constructon
Supervision of Catarman-Clabayog via
Lope de Vega and iloilo East Coast-Capiz Roads Improvement
Project under the Arterial Road Links
Development Project (V) |
|
|
| 1) |
Pacific Consultants Int'l in ass with Philipps Technical Consultants Corp. Design Science, Inc., Urban Integrated Consultants, Inc., JF Cancio and Associates, and Sustainable Eco-systems International Corp. |
|
2) |
|
Y 279,834,870.00
|
|
P 32,434,860.00
|
|
P 2,850,350.00
|
|
| 3) |
3/7/2002 |
|
|
| A) |
PMO-SPIADP |
| B) |
JBIC Loan No. PH-P225 |
| C) |
Competitive Selection (Quality Based Selection) |
|
| |
Consulting Services for the Detailed Eng'g Design & Construction Supervision of the Soil Erosion Protection Project Rehabilitation of Taytay-El Nido Road Sustainable Environmental Management Project in Northern Palawan |
|
|
| 1) |
Pacific Consultants Int'l in ass with Filipinas Dravo Corp, Philipps Technical Consultants Corp. TCGI Engineers, Sustainable Ecosystems Int'l Corp & JF Cancio & Associates |
|
2) |
|
Y 176,440,000.00
|
|
P 22,821,193.00
|
|
P 2,685,400.00
|
|
| 3) |
9/27/2001 |
|
|
| A) |
PMO-IBRD |
| B) |
IBRD Loan No.
7006-PH |
| C) |
Competitive Selection (Quality Cost Based Selection) |
|
| |
Consulting Services for the Feasibility
Studies and Detailed Engineering Design of Remedial Works in Landslide Areas and Road Slip Sections, NRIMP-1 |
|
|
| 1) |
Japan Overseas Consultants Co. Ltd. in ass. with Techniks Group Corp. & Certeza Development Corp |
|
2) |
|
$330,400.00
|
|
P 12,322,500.00
|
|
|
|
| 3) |
|
|
contract under process |
| A) |
PMO-URPO |
| B) |
JBIC Loan No. PH-P218 |
| C) |
Competitive Selection (Quality Based Selection) |
|
| |
Consulting Services for the Detailed
Engineering of C-3(Sgt. Rivera St.)/A.
Bonifacio Ave. Interchange and C-2
Gov. Forbes Ave.)/R-7 Espana St)
Interchange Project |
|
|
| 1) |
Pacific Consultant Int'l in ass with Design Science Inc with Philipps Technical Consultants Corp & JF Cancio & Associates |
|
2) |
|
Y 64,222,260.00
|
|
P 24,438,588.00
|
|
P 1,311,640.00
|
|
| 3) |
|
|
for signature of the Sec |
| A) |
PMO-PJHL |
| B) |
JBIC 25th Special Yen Loan |
| C) |
Competitive Selection (Quality Based Selection) |
|
| |
Consulting Services for the Review of Detailed Engineering Design and
Construction Supervision of the Philippine-Japan Friendship Highway
Rehabilitation Project (Visayas Section,
Phase II) under the Arterial Road Links
Development Project (VI) |
|
|
| 1) |
Katahira & Engineers Int'l in joint venture with Development Eng'g & Management Corp. ProConsult Inc. Eng'g & Management Corp of the Phils., Multi-Infra Konsult, Inc. and Filipinas Dravo Corp. |
|
2) |
|
Y 310,411,500.00
|
|
P 157,193,085.00
|
|
P 7,782,600.00
|
|
| 3) |
|
|
contract under process |
| A) |
PMO-PJHL |
| B) |
JBIC 25th Special Yen Loan |
| C) |
Competitive Selection (Quality Based Selection) |
|
| |
Consulting Services for the Alignment Study and Detailed Engineering Design of the Cebu North Coastal Road Project under the Arterial Links Development Project (VI) |
|
|
| 1) |
Pacific Consultants Int'l in ass with CEDCO Inc and Philipps Technical Consultants Corporation |
|
2) |
|
Y 112,790,580.00
|
|
P 46,015,923.00
|
|
P 1,978,300.00
|
|
| 3) |
|
|
contract under process |
| A) |
PMO-URPO |
| B) |
JBIC Loan No. PH-P218 |
| C) |
Competitive Selection (Quality Based Selection) |
|
| |
Consulting Services for the Detailed
Engineering of C-3 (G. Araneta Ave.) / Quezon Ave. Interchange and
C-3 (G. Araneta Ave.)/E. Rodriquez
Ave. Interchange Projects |
|
|
| 1) |
Nippon Engineering Consultant in ass with DCCD Engineering Corp. & Perconsult Int'l. |
|
2) |
|
Y 61,768,650.00
|
|
P 21,480,598.20
|
|
P 1,368,740.20
|
|
| 3) |
|
|
for signature of the Sec. |