a

   "Daang Matuwid, Kaunlaran ang Hatid"                                                                                                                         Right Project, Right Cost, Right Quality                                                                                                                                                                         

::  HOME  ::  ABOUT US  ::  INFRASTRUCTURE  ::  DOING BUSINESS  ::  EMPLOYMENT  ::  DIRECTORY  ::  FEEDBACK  ::  NEWS  ::  FAQs

About PPP

 Main

 CALA Expressway - Cavite Side  

 NAIA Expressway -  Phase II  

 CLEx Phase I, Tarlac Cabanatuan

 CLEx Phase II, Cabanatuan - San Jose

 Calamba - Los Baños Expressway

 CALA Expressway - Laguna Side  

 C-5/FTI/Skyway Connector  

 C-6 Expressway - North Section

 C-6 Expressway - Remaining South Section

 C-6 Extension (Laguna de Bay Flood Control Dike Expressway)

 NLEx East/ La Mesa Parkway  

 NLEx-SLEx Link Expressway

 R-7 Expressway

 SLEx Extension (to Lucena City) 

 Daang Hari - SLEx Link 

 
Project Screening and Selection of Priority Projects
Recommended Types of  PPP schemes
Other  DPWH PPP Projects under Development
Water Supply and Sanitation Policy under PPP Being Developed
Master Plan for High Standard Highways/ Expressways for PPP
Expressways in Operation and Under Construction/Planning
Existing and Proposed Expressways : 200 Km Sphere of Metro Manila
 

PPP Contact Information

Public-Private Partnership (PPP) Center

  Private-Public Partnership Service

C-6 Expressway (Global City Link) - North Section

Project Description :

•

Function as distributor of traffic coming from expressway in the north to Metro Manila

•

Contribute to sound urban development of Rizal and Bulacan Provinces

•

Starts from NLEx at Bocaue/Marilao boundary and traverses Sta. Maria, San Jose del Monte, Rodriguez, San Mateo, Antipolo, Taytay and Taguig and connected with Skyway at Bicutan. The north section is to be built by MRT-7 Consortium

•

4 lanes, length 16.5 km

•

Estimated cost PhP 7.85 Billion (US$178.4 Million)(1US$ =Php 45.00)

 

 

Project Status :

•

MRT-7 Consortium will build this north section access road to MRT 7 Terminal
   
   

click image for a larger view

 

 
 
 

 

 

 
 
© 2008 Department of Public Works and Highways
Bonifacio Drive, Port Area, Manila

Trunk line Number: (632) 304-3000