Project Description : |
|
• |
Provide
direct access to Food Terminal Inc. (FTI) from both
Skyway and C-5 |
|
• |
Length
6.8 km (including ramps) |
|
• |
2 to 4 lanes |
|
• |
L = 3.0 Km |
|
Implementation Schedule : |
|
• |
2013 to 2015 |
|
Project Cost : |
|
• |
PhP 5.64 Billion
(US$125.33 Million)
(1US$ =Php 45.00) |
|
|
|
|
Project Status : |
|
• |
Feasibility Study was completed in 2006 |
|
• |
Detailed Design already completed ( August, 2010)-
under review by the Bureau of Design, DPWH |
|
• |
Bidding/Tendering – 2012 |
|
• |
Detailed Design and Construction Schedule – 2013
to
2015 |
| |
|
| |
|
|