a

   "Daang Matuwid, Kaunlaran ang Hatid"                                                                                                                         Right Project, Right Cost, Right Quality, Right on Time                                                                                                                                                                     
Images of different DPWH Projects

::  HOME  ::  ABOUT US  ::  INFRASTRUCTURE  ::  DOING BUSINESS  ::  EMPLOYMENT  ::  DIRECTORY  ::  FEEDBACK  ::  NEWS  ::  FAQs

 Main

 Cavite-Laguna (CALA) Expressway

 NAIA Expressway 

 Central Luzon Link Expressway (CLLEX),Phase 1

 CLLEx Phase II, Cabanatuan - San Jose

 Calamba - Los Baños Expressway

 C-5/FTI/Skyway Connector

 C-6 Expressway - North Section

 C-6 Expressway and Global Link (South Section)

 C-6 Extension (Laguna de Bay Flood Control Dike Expressway)

 NLEx East Expressway

 NLEx-SLEx Link Connector

 R-7 Expressway

 SLEx Extension (to Lucena City)

 Daang Hari – SLEx Link Project

 Kennon O & M

 Dalton Pass East Alignment

 Tarlac-Pangasinan-La Union Toll Expressway (TPLEX)

 Improvement/Rehabilitation of the Quirino Highway Project

 School Buildings

 PPP Bridges in Luzon, Batch 1

 Tagum-Davao-General Santos High Standard Highway

 Cebu-North Coastal Road

 STAR Project Construction of Stage II,Phase 2 and Improvement of Stage I

 South Luzon Expressway Toll Road 4 (TR-4) Sto. Tomas-Lucena Project

 
Project Screening and Selection of Priority Projects
Recommended Types of  PPP schemes
Other  DPWH PPP Projects under Development
Water Supply and Sanitation Policy under PPP Being Developed
Master Plan for High Standard Highways/ Expressways for PPP
Expressways in Operation and Under Construction/Planning
Existing and Proposed Expressways : 200 Km Sphere of Metro Manila
 

PPP Contact Information

Public-Private Partnership (PPP) Center

  Private-Public Partnership Service

C-5/FTI/Skyway Connector

Project Description :
  • Provide direct access to Food Terminal Inc. (FTI) from both Skyway and C-5
  • Length 6.8 km (including ramps)
  • 2 to 4 lanes
  • L = 3.0 Km
Implementation Schedule :
  • 2013 to 2015
Project Cost :
  • PhP 5.64 Billion
  • (US$125.33 Million)
  • (1US$ =Php 45.00)
Project Status :
  • Feasibility Study was completed in 2006
  • Detailed Design already completed ( August, 2010)- under review by the Bureau of Design, DPWH
  • Bidding/Tendering – 2012
  • Detailed Design and Construction Schedule – 2013 to 2015

click image for a larger view